Solar power plant, Florida

Chautauqua Solar Energy Center, Florida

Chautauqua Solar Energy Center is a 74.5 MW solar power plant in Walton County, Florida, operated by Florida Power & Light Co, and it generated 168,910 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 71st percentile of U.S. solar plants. By 2025 generation it ranks 2,727th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
26%Capacity factor, 2025, 71st percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does the Chautauqua Solar Energy Center plant run compared with other solar plants?

The Chautauqua Solar Energy Center plant had a capacity factor of 26% in 2025 on 74.5 MW of net summer capacity, the 71st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 94 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Chautauqua Solar Energy Center26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Chautauqua Solar Energy Center plant generating more or less than last year?

Generation at Chautauqua Solar Energy Center rose 2.9% from 2024 to 2025, from 164,164 MWh to 168,910 MWh. Through August 2026 it is running 3.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024164,164
2025168,910
2026 through August120,754
2025, same months116,555
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,614
July 202617,981
June 202616,128
May 202614,366
April 202616,335
March 202616,949
February 202611,860
January 202610,521
December 20259,299
November 202512,726
October 202514,144
September 202516,186
August 202514,721
July 202517,282
June 202516,050
May 202517,102
April 202516,577
March 202515,697
February 202510,403
January 20258,723
December 20249,751
November 20248,321
October 202413,912
September 202410,577
August 202418,006
July 202416,708
June 202417,814
May 202416,756
April 202416,622
March 202413,674
February 202411,676
January 202410,347

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Chautauqua Solar Energy Center plant?

Chautauqua Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 682nd largest of 7,223 solar plants. By 2025 generation it is the 115th largest of 313 generating plants in the state.

Chautauqua Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)168,910267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Chautauqua Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Chautauqua Solar Energy Center plant?

EIA lists no joint owners for Chautauqua Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Chautauqua Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Chautauqua Solar Energy Center plant?

Chautauqua Solar Energy Center is in Defuniak Springs, Walton County, Florida, at 30.8758° N, 86.2081° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Chautauqua Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Elder BranchManatee75166,620
GroveIndian River75143,667
Bluefield Preserve SolarSt Lucie75143,764
Chautauqua Solar Energy CenterWalton75168,910
FPL Chipola River Solar Energy CenterCalhoun75154,592
Everglades Solar Energy CenterMiami Dade75144,968
First City Solar Energy CenterEscambia75127,746

Source: EIA Forms EIA-860 and EIA-923, 2025.