Skip to main content
RateWatt

Solar power plant, Florida

Elder Branch solar power plant, Florida

Elder Branch is a 74.5 MW solar power plant in Manatee County, Florida, operated by Florida Power & Light Co, and it generated 166,620 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 2,744th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
26%Capacity factor, 2025, 69th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
3 yearsAverage generator age, by MW

How hard does the Elder Branch plant run compared with other solar plants?

The Elder Branch plant had a capacity factor of 26% in 2025 on 74.5 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Elder Branch26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Elder Branch plant generating more or less than last year?

Generation at Elder Branch rose 0.3% from 2024 to 2025, from 166,178 MWh to 166,620 MWh. Through August 2026 it is running 2.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024166,178
2025166,620
2026 through August116,140
2025, same months119,117
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,545
July 202613,746
June 202615,483
May 202617,270
April 202617,612
March 202615,455
February 202611,694
January 202610,335
December 202510,413
November 202511,953
October 202512,248
September 202512,889
August 202513,903
July 202516,451
June 202515,450
May 202517,084
April 202519,324
March 202516,654
February 202510,902
January 20259,349
December 202410,221
November 20247,266
October 20248,766
September 202414,460
August 202415,578
July 202416,050
June 202416,887
May 202420,183
April 202419,609
March 202415,335
February 202413,658
January 20248,165

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Elder Branch plant?

Elder Branch made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 679th largest of 7,223 solar plants. By 2025 generation it is the 117th largest of 313 generating plants in the state.

Elder Branch within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)166,620267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Elder Branch plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Elder Branch plant?

EIA lists no joint owners for Elder Branch. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Elder Branch, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Elder Branch plant?

Elder Branch is in Parrish, Manatee County, Florida, at 27.5966° N, 82.2527° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Elder Branch's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Ghost Orchid Solar Energy CenterHendry75151,671
SundewSt Lucie75147,980
ImmokaleeCollier75159,484
Elder BranchManatee75166,620
GroveIndian River75143,667
Bluefield Preserve SolarSt Lucie75143,764
Chautauqua Solar Energy CenterWalton75168,910

Source: EIA Forms EIA-860 and EIA-923, 2025.