Skip to main content
RateWatt

Solar power plant, Florida

Ghost Orchid Solar Energy Center, Florida

Ghost Orchid Solar Energy Center is a 74.5 MW solar power plant in Hendry County, Florida, operated by Florida Power & Light Co, and it generated 151,671 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 51st percentile of U.S. solar plants. By 2025 generation it ranks 2,886th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
23%Capacity factor, 2025, 51st percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
3 yearsAverage generator age, by MW

How hard does the Ghost Orchid Solar Energy Center plant run compared with other solar plants?

The Ghost Orchid Solar Energy Center plant had a capacity factor of 23% in 2025 on 74.5 MW of net summer capacity, the 51st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ghost Orchid Solar Energy Center23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ghost Orchid Solar Energy Center plant generating more or less than last year?

Generation at Ghost Orchid Solar Energy Center rose 4.1% from 2024 to 2025, from 145,754 MWh to 151,671 MWh. Through August 2026 it is running 5.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024145,754
2025151,671
2026 through August98,571
2025, same months104,216
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,461
July 202613,253
June 202612,904
May 202613,656
April 202612,546
March 202612,559
February 202610,839
January 202610,353
December 202511,595
November 202511,591
October 202512,588
September 202511,681
August 202513,095
July 202513,441
June 202512,124
May 202514,513
April 202515,196
March 202514,742
February 202511,438
January 20259,667
December 202410,541
November 202411,311
October 202410,643
September 202412,284
August 202412,168
July 202413,204
June 202411,909
May 202415,360
April 202415,691
March 202412,982
February 202412,022
January 20247,639

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Ghost Orchid Solar Energy Center plant?

Ghost Orchid Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 676th largest of 7,223 solar plants. By 2025 generation it is the 150th largest of 313 generating plants in the state.

Ghost Orchid Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)151,671267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ghost Orchid Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ghost Orchid Solar Energy Center plant?

EIA lists no joint owners for Ghost Orchid Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Ghost Orchid Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Ghost Orchid Solar Energy Center plant?

Ghost Orchid Solar Energy Center is in Clewiston, Hendry County, Florida, at 26.4172° N, 81.0353° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Ghost Orchid Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Blue SpringsJackson75129,384
Cotton Creek Solar Energy CenterEscambia75123,575
Sawgrass Solar Energy CenterHendry75147,601
Ghost Orchid Solar Energy CenterHendry75151,671
SundewSt Lucie75147,980
ImmokaleeCollier75159,484
Elder BranchManatee75166,620

Source: EIA Forms EIA-860 and EIA-923, 2025.