Skip to main content
RateWatt

Solar power plant, Florida

Cotton Creek Solar Energy Center, Florida

Cotton Creek Solar Energy Center is a 74.5 MW solar power plant in Escambia County, Florida, operated by Florida Power & Light Co, and it generated 123,575 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 20th percentile of U.S. solar plants. By 2025 generation it ranks 3,166th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
19%Capacity factor, 2025, 20th percentile, on 74.5 MW net summer
3,166thU.S. rank by generation, 2025
4 yearsAverage generator age, by MW

How hard does the Cotton Creek Solar Energy Center plant run compared with other solar plants?

The Cotton Creek Solar Energy Center plant had a capacity factor of 19% in 2025 on 74.5 MW of net summer capacity, the 20th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 69 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cotton Creek Solar Energy Center19%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cotton Creek Solar Energy Center plant generating more or less than last year?

Generation at Cotton Creek Solar Energy Center fell 12.0% from 2024 to 2025, from 140,435 MWh to 123,575 MWh. Through August 2026 it is running 8.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024140,435
2025123,575
2026 through August88,452
2025, same months81,295
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,968
July 202614,104
June 202612,278
May 202610,956
April 202611,121
March 202610,555
February 20268,492
January 20267,978
December 20257,915
November 20259,595
October 202511,140
September 202513,630
August 202511,930
July 202512,529
June 202512,172
May 202513,112
April 20259,357
March 20255,903
February 20258,703
January 20257,589
December 20249,525
November 20247,808
October 202413,797
September 202410,010
August 202414,827
July 202412,240
June 202413,525
May 202414,055
April 202413,100
March 202411,042
February 202410,421
January 202410,085

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Cotton Creek Solar Energy Center plant?

Cotton Creek Solar Energy Center made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 674th largest of 7,223 solar plants. By 2025 generation it is the 207th largest of 313 generating plants in the state.

Cotton Creek Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)123,575267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cotton Creek Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cotton Creek Solar Energy Center plant?

EIA lists no joint owners for Cotton Creek Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Cotton Creek Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Cotton Creek Solar Energy Center plant?

Cotton Creek Solar Energy Center is in McDavid, Escambia County, Florida, at 30.8419° N, 87.3440° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Cotton Creek Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Jamison Solar (FL)Polk75138,907
Magnolia SolarPolk75144,052
Blue SpringsJackson75129,384
Cotton Creek Solar Energy CenterEscambia75123,575
Sawgrass Solar Energy CenterHendry75147,601
Ghost Orchid Solar Energy CenterHendry75151,671
SundewSt Lucie75147,980