Jamison Solar power plant, Florida

Jamison Solar (FL) is a 74.5 MW solar power plant in Polk County, Florida, operated by Tampa Electric Co, and it generated 138,907 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 35th percentile of U.S. solar plants. By 2025 generation it ranks 3,019th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
21%Capacity factor, 2025, 35th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
3 yearsAverage generator age, by MW

How hard does the Jamison Solar (FL) plant run compared with other solar plants?

The Jamison Solar (FL) plant had a capacity factor of 21% in 2025 on 74.5 MW of net summer capacity, the 35th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Jamison Solar (FL)21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Jamison Solar (FL) plant generating more or less than last year?

Generation at Jamison Solar (FL) fell 2.7% from 2024 to 2025, from 142,724 MWh to 138,907 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024142,724
2025138,907
2026 through August100,537
2025, same months101,544
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,971
July 202612,613
June 202612,883
May 202615,029
April 202614,851
March 202613,330
February 20269,786
January 20269,074
December 20257,985
November 20259,432
October 202510,479
September 20259,467
August 202511,995
July 202512,903
June 202513,196
May 202514,687
April 202516,771
March 202514,448
February 20259,332
January 20258,212
December 20248,482
November 20249,543
October 20248,435
September 202410,929
August 202412,241
July 202414,933
June 202414,794
May 202417,378
April 202416,055
March 202412,596
February 202410,584
January 20246,754

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Jamison Solar (FL) plant?

Jamison Solar (FL) made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 671st largest of 7,223 solar plants. By 2025 generation it is the 181st largest of 313 generating plants in the state.

Jamison Solar (FL) within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)138,907267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Jamison Solar (FL) plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Jamison Solar (FL) plant?

EIA lists no joint owners for Jamison Solar (FL). Tampa Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tampa Electric Co charge homes?

Tampa Electric Co, the operator of Jamison Solar (FL), had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Tampa Electric Co17.32¢$19414% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Jamison Solar (FL) plant?

Jamison Solar (FL) is in Mulberry, Polk County, Florida, at 27.8066° N, 81.9557° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Jamison Solar (FL)'s 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Duette Solar Power PlantManatee75169,954
Fort Drum Energy CenterOkeechobee75137,900
Willow Solar Energy CenterManatee75154,270
Jamison Solar (FL)Polk75138,907
Magnolia SolarPolk75144,052
Blue SpringsJackson75129,384
Cotton Creek Solar Energy CenterEscambia75123,575

Source: EIA Forms EIA-860 and EIA-923, 2025.