Skip to main content
RateWatt

Solar power plant, Florida

Duette Solar Power Plant, Florida

Duette Solar Power Plant is a 74.5 MW solar power plant in Manatee County, Florida, operated by Duke Energy Florida, LLC, and it generated 169,954 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 71st percentile of U.S. solar plants. By 2025 generation it ranks 2,721st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
26%Capacity factor, 2025, 71st percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
4 yearsAverage generator age, by MW

How hard does Duette Solar Power Plant run compared with other solar plants?

Duette Solar Power Plant had a capacity factor of 26% in 2025 on 74.5 MW of net summer capacity, the 71st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Duette Solar Power Plant26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Duette Solar Power Plant generating more or less than last year?

Generation at Duette Solar Power Plant rose 9.1% from 2024 to 2025, from 155,765 MWh to 169,954 MWh. Through August 2026 it is running 0.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024155,765
2025169,954
2026 through August118,797
2025, same months118,886
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,151
July 202614,384
June 202616,257
May 202615,640
April 202617,558
March 202615,664
February 202611,641
January 202611,502
December 202510,783
November 202512,401
October 202514,538
September 202513,346
August 202513,925
July 202515,674
June 202515,335
May 202516,812
April 202518,582
March 202517,227
February 202511,520
January 20259,811
December 202410,399
November 202411,566
October 202410,831
September 202413,467
August 202413,583
July 202415,381
June 202415,852
May 202417,741
April 202415,607
March 202412,190
February 202411,491
January 20247,657

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Duette Solar Power Plant?

Duette Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 668th largest of 7,223 solar plants. By 2025 generation it is the 113th largest of 313 generating plants in the state.

Duette Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)169,954267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Duette Solar Power Plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Duette Solar Power Plant?

EIA lists no joint owners for Duette Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Duette Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Duette Solar Power Plant?

Duette Solar Power Plant is in Parrish, Manatee County, Florida, at 27.5858° N, 82.0620° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Duette Solar Power Plant's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Harmony Solar (FL)Osceola75178,635
Taylor Creek SolarOrange75179,023
Gulf Power Blue Indigo EnergyJackson75132,485
Duette Solar Power PlantManatee75169,954
Fort Drum Energy CenterOkeechobee75137,900
Willow Solar Energy CenterManatee75154,270
Jamison Solar (FL)Polk75138,907

Source: EIA Forms EIA-860 and EIA-923, 2025.