Fort Drum Energy Center, Florida

Fort Drum Energy Center is a 74.5 MW solar power plant in Okeechobee County, Florida, operated by Florida Power & Light Co, and it generated 137,900 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 33rd percentile of U.S. solar plants. By 2025 generation it ranks 3,028th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
21%Capacity factor, 2025, 33rd percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
4 yearsAverage generator age, by MW

How hard does the Fort Drum Energy Center plant run compared with other solar plants?

The Fort Drum Energy Center plant had a capacity factor of 21% in 2025 on 74.5 MW of net summer capacity, the 33rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fort Drum Energy Center21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fort Drum Energy Center plant generating more or less than last year?

Generation at Fort Drum Energy Center rose 12.9% from 2024 to 2025, from 122,092 MWh to 137,900 MWh. Through August 2026 it is running 2.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024122,092
2025137,900
2026 through August93,756
2025, same months96,148
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,484
July 202612,872
June 202612,198
May 202613,468
April 202613,421
March 202612,884
February 20269,584
January 20267,845
December 20256,788
November 20259,697
October 202510,801
September 202514,466
August 202511,964
July 202514,022
June 202513,943
May 202514,879
April 202514,611
March 20259,455
February 20258,364
January 20258,910
December 20248,104
November 20247,451
October 202411,642
September 20248,705
August 202413,438
July 202411,982
June 202412,843
May 202412,523
April 202412,405
March 20249,758
February 20247,194
January 20246,047

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Fort Drum Energy Center plant?

Fort Drum Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 669th largest of 7,223 solar plants. By 2025 generation it is the 183rd largest of 313 generating plants in the state.

Fort Drum Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)137,900267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fort Drum Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FORTDOperatingSolar Photovoltaic752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fort Drum Energy Center plant?

EIA lists no joint owners for Fort Drum Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Fort Drum Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Fort Drum Energy Center plant?

Fort Drum Energy Center is in Vero Beach, Okeechobee County, Florida, at 27.6079° N, 80.7581° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Fort Drum Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Taylor Creek SolarOrange75179,023
Gulf Power Blue Indigo EnergyJackson75132,485
Duette Solar Power PlantManatee75169,954
Fort Drum Energy CenterOkeechobee75137,900
Willow Solar Energy CenterManatee75154,270
Jamison Solar (FL)Polk75138,907
Magnolia SolarPolk75144,052