Willow Solar Energy Center is a 74.5 MW solar power plant in Manatee County, Florida, operated by Florida Power & Light Co, and it generated 154,270 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 54th percentile of U.S. solar plants. By 2025 generation it ranks 2,858th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
24%Capacity factor, 2025, 54th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
4 yearsAverage generator age, by MW

How hard does the Willow Solar Energy Center plant run compared with other solar plants?

The Willow Solar Energy Center plant had a capacity factor of 24% in 2025 on 74.5 MW of net summer capacity, the 54th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Willow Solar Energy Center24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Willow Solar Energy Center plant generating more or less than last year?

Generation at Willow Solar Energy Center fell 1.5% from 2024 to 2025, from 156,679 MWh to 154,270 MWh. Through August 2026 it is running 0.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024156,679
2025154,270
2026 through August110,186
2025, same months110,242
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,711
July 202613,298
June 202615,388
May 202616,508
April 202616,775
March 202614,487
February 202610,777
January 20269,242
December 20259,919
November 202510,369
October 202512,402
September 202511,338
August 202512,267
July 202515,359
June 202513,847
May 202515,688
April 202517,550
March 202515,879
February 202510,402
January 20259,250
December 20249,785
November 202410,508
October 202410,845
September 202413,480
August 202414,255
July 202415,033
June 202414,993
May 202417,347
April 202415,599
March 202414,000
February 202412,788
January 20248,046

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Willow Solar Energy Center plant?

Willow Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 670th largest of 7,223 solar plants. By 2025 generation it is the 147th largest of 313 generating plants in the state.

Willow Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)154,270267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Willow Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WILLOOperatingSolar Photovoltaic752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Willow Solar Energy Center plant?

EIA lists no joint owners for Willow Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Willow Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Willow Solar Energy Center plant?

Willow Solar Energy Center is in Myakka City, Manatee County, Florida, at 27.4481° N, 82.0807° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Willow Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Gulf Power Blue Indigo EnergyJackson75132,485
Duette Solar Power PlantManatee75169,954
Fort Drum Energy CenterOkeechobee75137,900
Willow Solar Energy CenterManatee75154,270
Jamison Solar (FL)Polk75138,907
Magnolia SolarPolk75144,052
Blue SpringsJackson75129,384

Source: EIA Forms EIA-860 and EIA-923, 2025.