Chestnut Solar power plant, North Carolina

Chestnut Solar is a 74.9 MW solar power plant in Halifax County, North Carolina, operated by Dominion Renewable Energy, and it generated 146,851 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 44th percentile of U.S. solar plants. By 2025 generation it ranks 2,935th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
22%Capacity factor, 2025, 44th percentile, on 74.9 MW net summer
0.1%Of NC generation, 2025
5 yearsAverage generator age, by MW

How hard does the Chestnut Solar plant run compared with other solar plants?

The Chestnut Solar plant had a capacity factor of 22% in 2025 on 74.9 MW of net summer capacity, the 44th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Chestnut Solar22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Chestnut Solar plant generating more or less than last year?

Generation at Chestnut Solar fell 2.2% from 2024 to 2025, from 150,213 MWh to 146,851 MWh. Through August 2026 it is running 7.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024150,213
2025146,851
2026 through August116,220
2025, same months108,301
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,418
July 202616,338
June 202618,015
May 202617,823
April 202617,655
March 202615,202
February 20268,227
January 20267,542
December 20256,601
November 20259,510
October 202510,899
September 202511,540
August 202512,324
July 202517,602
June 202517,268
May 202513,748
April 202516,524
March 202513,876
February 20257,740
January 20259,219
December 20247,409
November 20247,731
October 202412,960
September 202410,459
August 202415,764
July 202415,733
June 202418,830
May 202412,790
April 202415,653
March 202413,963
February 202410,652
January 20248,269

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Chestnut Solar plant?

Chestnut Solar made 0.1% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.2% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 56th largest of 928 plants in North Carolina, the 3,131st largest of 14,327 in the U.S. and the 598th largest of 7,223 solar plants. By 2025 generation it is the 51st largest of 872 generating plants in the state.

Chestnut Solar within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)7539,9330.2%
Generation (MWh)146,851134,194,4340.1%
Solar capacity (MW)757,0251.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Chestnut Solar plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Chestnut Solar plant?

EIA lists no joint owners for Chestnut Solar. Dominion Renewable Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Chestnut Solar plant?

Chestnut Solar is in Enfield, Halifax County, North Carolina, at 36.1800° N, 77.7120° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Chestnut Solar's 74.9 MW is 1% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Trent River Solar, LLCJones79137,074
Innovative Solar 46Cumberland79127,999
Pecan SolarNorthampton75152,768
Chestnut SolarHalifax75146,851
Rutherford FarmRutherford75135,837
NC 102 Project LLCCabarrus75139,935
Misenheimer Solar LLCStanly74161,038

Source: EIA Forms EIA-860 and EIA-923, 2025.