Skip to main content
RateWatt

Solar power plant, North Carolina

Misenheimer Solar LLC power plant, North Carolina

Misenheimer Solar LLC is a 74.4 MW solar power plant in Stanly County, North Carolina, operated by Misenheimer Solar LLC, and it generated 161,038 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 63rd percentile of U.S. solar plants. By 2025 generation it ranks 2,801st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.4 MWNameplate capacity
25%Capacity factor, 2025, 63rd percentile, on 74.4 MW net summer
0.1%Of NC generation, 2025
1 yearAverage generator age, by MW

How hard does the Misenheimer Solar LLC plant run compared with other solar plants?

The Misenheimer Solar LLC plant had a capacity factor of 25% in 2025 on 74.4 MW of net summer capacity, the 63rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Misenheimer Solar LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Misenheimer Solar LLC plant generating more or less than last year?

Misenheimer Solar LLC generated 161,038 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.4% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024112,999
2025161,038
2026 through August114,253
2025, same months114,658
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,372
July 202617,191
June 202619,151
May 202617,832
April 202614,656
March 202612,907
February 20268,485
January 20267,659
December 20257,670
November 202511,336
October 202511,969
September 202515,405
August 202513,705
July 202518,840
June 202519,545
May 202514,512
April 202514,223
March 202514,891
February 20258,635
January 202510,307
December 20248,563
November 20247,925
October 202414,465
September 202412,352
August 202418,038
July 202415,145
June 202419,492
May 202412,525
April 20244,494
March 20240
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Misenheimer Solar LLC plant?

Misenheimer Solar LLC made 0.1% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.2% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 60th largest of 928 plants in North Carolina, the 3,277th largest of 14,327 in the U.S. and the 751st largest of 7,223 solar plants. By 2025 generation it is the 47th largest of 872 generating plants in the state.

Misenheimer Solar LLC within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)7439,9330.2%
Generation (MWh)161,038134,194,4340.1%
Solar capacity (MW)747,0251.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Misenheimer Solar LLC plant, and when do they retire?

1 operable generator totals 74.4 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s174100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic742024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Misenheimer Solar LLC plant?

EIA lists no joint owners for Misenheimer Solar LLC. Misenheimer Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Misenheimer Solar LLC plant?

Misenheimer Solar LLC is in Gold Hill, Stanly County, North Carolina, at 35.4781° N, 80.3001° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Misenheimer Solar LLC's 74.4 MW is 1% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Chestnut SolarHalifax75146,851
Rutherford FarmRutherford75135,837
NC 102 Project LLCCabarrus75139,935
Misenheimer Solar LLCStanly74161,038
Innovative Solar 42Bladen7194,638
Cabin Creek Solar, LLCMontgomery70162,795
Crooked RunPender70137,181