Skip to main content
RateWatt

Solar power plant, North Carolina

Innovative Solar 42 power plant, North Carolina

Innovative Solar 42 is a 71 MW solar power plant in Bladen County, North Carolina, operated by Novis Renewables, LLC, and it generated 94,638 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 3,456th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

71 MWNameplate capacity
15%Capacity factor, 2025, 12th percentile, on 71 MW net summer
0.1%Of NC generation, 2025
8 yearsAverage generator age, by MW

How hard does the Innovative Solar 42 plant run compared with other solar plants?

The Innovative Solar 42 plant had a capacity factor of 15% in 2025 on 71 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 56 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Innovative Solar 4215%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Innovative Solar 42 plant generating more or less than last year?

Generation at Innovative Solar 42 fell 23.9% from 2024 to 2025, from 124,441 MWh to 94,638 MWh. Through August 2026 it is running 18.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024124,441
202594,638
2026 through August60,226
2025, same months73,421
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20266,785
July 20267,454
June 20269,227
May 20268,902
April 20269,539
March 20267,498
February 20265,443
January 20265,378
December 20254,574
November 20255,011
October 20254,967
September 20256,665
July 202510,792
June 202511,497
May 202511,459
April 202513,093
March 202510,921
February 20257,707
January 20257,952
December 20246,637
November 20246,812
October 202410,602
September 20248,247
August 20246,470
July 202412,527
June 202415,178
May 202414,013
April 202413,860
March 202412,251
February 20249,828
January 20248,016

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Innovative Solar 42 plant?

Innovative Solar 42 made 0.1% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.2% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 61st largest of 928 plants in North Carolina, the 3,332nd largest of 14,327 in the U.S. and the 760th largest of 7,223 solar plants. By 2025 generation it is the 79th largest of 872 generating plants in the state.

Innovative Solar 42 within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)7139,9330.2%
Generation (MWh)94,638134,194,4340.1%
Solar capacity (MW)717,0251.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Innovative Solar 42 plant, and when do they retire?

1 operable generator totals 71 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s171100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
IS042OperatingSolar Photovoltaic712017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Innovative Solar 42 plant?

EIA lists no joint owners for Innovative Solar 42. Novis Renewables, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Innovative Solar 42 plant?

Innovative Solar 42 is in Fayetteville, Bladen County, North Carolina, at 34.8476° N, 78.8774° W. It sits in the Duke Energy Progress East balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Innovative Solar 42's 71 MW is 1% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Rutherford FarmRutherford75135,837
NC 102 Project LLCCabarrus75139,935
Misenheimer Solar LLCStanly74161,038
Innovative Solar 42Bladen7194,638
Cabin Creek Solar, LLCMontgomery70162,795
Crooked RunPender70137,181
Bay TreeBladen70146,548

Source: EIA Forms EIA-860 and EIA-923, 2025.