Hydro power plant, Washington

Chief Joseph hydroelectric power plant, Washington

Chief Joseph is a 2,456 MW hydro power plant in Douglas County, Washington, operated by USACE Northwestern Division, and it generated 9,806,156 MWh in 2025 (Forms EIA-860 and EIA-923). That is 9.7% of the generation reported in Washington, and its capacity factor sits at the 79th percentile of U.S. hydro plants. By 2025 generation it ranks 67th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

2,456 MWNameplate capacity
46%Capacity factor, 2025, 79th percentile, on 2,456 MW net summer
9.7%Of WA generation, 2025
59 yearsAverage generator age, by MW

How hard does the Chief Joseph plant run compared with other hydro plants?

The Chief Joseph plant had a capacity factor of 46% in 2025 on 2,456 MW of net summer capacity, the 79th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 166 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Chief Joseph46%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Chief Joseph plant generating more or less than last year?

Generation at Chief Joseph rose 6.3% from 2024 to 2025, from 9,227,828 MWh to 9,806,156 MWh. Through August 2026 it is running 29.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20249,227,828
20259,806,156
2026 through August8,874,425
2025, same months6,830,333
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026859,100
July 20261,010,406
June 20261,223,439
May 20261,188,245
April 20261,052,298
March 20261,172,699
February 20261,116,167
January 20261,252,071
December 20251,009,690
November 2025802,743
October 2025630,634
September 2025532,756
August 2025911,126
July 2025853,460
June 2025957,916
May 2025957,041
April 2025985,768
March 2025655,019
February 2025645,347
January 2025864,656
December 2024907,781
November 2024817,635
October 2024536,789
September 2024537,673
August 2024915,311
July 20241,067,388
June 20241,021,866
May 2024856,271
April 2024659,694
March 2024682,086
February 2024529,143
January 2024696,191

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Chief Joseph plant?

Chief Joseph made 9.7% of the 101,512,862 MWh reported by Washington plants in 2025, from 7.7% of the state's 31,712 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 2nd largest of 139 plants in Washington, the 31st largest of 14,327 in the U.S. and the 2nd largest of 1,393 hydro plants. By 2025 generation it is the 2nd largest of 129 generating plants in the state.

Chief Joseph within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)2,45631,7127.7%
Generation (MWh)9,806,156101,512,8629.7%
Hydro capacity (MW)2,45621,46211.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Chief Joseph plant, and when do they retire?

27 operable generators total 2,456 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s161,41157%none reported
1970s111,04543%none reported
Every generator, 27 in all
UnitStatusTechnologyMWIn servicePlanned retirement
9Out of service, returningConventional Hydroelectric881955n/a
10Out of service, returningConventional Hydroelectric881955n/a
11Out of service, returningConventional Hydroelectric881955n/a
12Out of service, returningConventional Hydroelectric881955n/a
6OperatingConventional Hydroelectric881956n/a
7Out of serviceConventional Hydroelectric881956n/a
8Out of serviceConventional Hydroelectric881956n/a
5OperatingConventional Hydroelectric881957n/a
13Out of service, returningConventional Hydroelectric881957n/a
14OperatingConventional Hydroelectric881957n/a
15OperatingConventional Hydroelectric881957n/a
16OperatingConventional Hydroelectric881957n/a
1OperatingConventional Hydroelectric881958n/a
2OperatingConventional Hydroelectric881958n/a
3OperatingConventional Hydroelectric881958n/a
4OperatingConventional Hydroelectric881958n/a
17OperatingConventional Hydroelectric951977n/a
18OperatingConventional Hydroelectric951977n/a
19Out of service, returningConventional Hydroelectric951977n/a
20OperatingConventional Hydroelectric951978n/a
21OperatingConventional Hydroelectric951978n/a
22OperatingConventional Hydroelectric951978n/a
23OperatingConventional Hydroelectric951978n/a
24OperatingConventional Hydroelectric951979n/a
25OperatingConventional Hydroelectric951979n/a
26OperatingConventional Hydroelectric951979n/a
27OperatingConventional Hydroelectric951979n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Chief Joseph plant?

EIA lists no joint owners for Chief Joseph. USACE Northwestern Division operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Chief Joseph plant?

Chief Joseph is in Bridgeport, Douglas County, Washington, at 47.9951° N, 119.6404° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Chief Joseph's 2,456 MW is 11% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Chief JosephDouglas2,4569,806,156
Rocky ReachChelan1,3495,241,117

Source: EIA Forms EIA-860 and EIA-923, 2025.