Hydro power plant, Washington
Chief Joseph hydroelectric power plant, Washington
Chief Joseph is a 2,456 MW hydro power plant in Douglas County, Washington, operated by USACE Northwestern Division, and it generated 9,806,156 MWh in 2025 (Forms EIA-860 and EIA-923). That is 9.7% of the generation reported in Washington, and its capacity factor sits at the 79th percentile of U.S. hydro plants. By 2025 generation it ranks 67th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Chief Joseph plant run compared with other hydro plants?
The Chief Joseph plant had a capacity factor of 46% in 2025 on 2,456 MW of net summer capacity, the 79th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 166 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Chief Joseph | 46% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Chief Joseph plant generating more or less than last year?
Generation at Chief Joseph rose 6.3% from 2024 to 2025, from 9,227,828 MWh to 9,806,156 MWh. Through August 2026 it is running 29.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 9,227,828 |
| 2025 | 9,806,156 |
| 2026 through August | 8,874,425 |
| 2025, same months | 6,830,333 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 859,100 |
| July 2026 | 1,010,406 |
| June 2026 | 1,223,439 |
| May 2026 | 1,188,245 |
| April 2026 | 1,052,298 |
| March 2026 | 1,172,699 |
| February 2026 | 1,116,167 |
| January 2026 | 1,252,071 |
| December 2025 | 1,009,690 |
| November 2025 | 802,743 |
| October 2025 | 630,634 |
| September 2025 | 532,756 |
| August 2025 | 911,126 |
| July 2025 | 853,460 |
| June 2025 | 957,916 |
| May 2025 | 957,041 |
| April 2025 | 985,768 |
| March 2025 | 655,019 |
| February 2025 | 645,347 |
| January 2025 | 864,656 |
| December 2024 | 907,781 |
| November 2024 | 817,635 |
| October 2024 | 536,789 |
| September 2024 | 537,673 |
| August 2024 | 915,311 |
| July 2024 | 1,067,388 |
| June 2024 | 1,021,866 |
| May 2024 | 856,271 |
| April 2024 | 659,694 |
| March 2024 | 682,086 |
| February 2024 | 529,143 |
| January 2024 | 696,191 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Chief Joseph plant, and when do they retire?
27 operable generators total 2,456 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 16 | 1,411 | 57% | none reported |
| 1970s | 11 | 1,045 | 43% | none reported |
Every generator, 27 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 9 | Out of service, returning | Conventional Hydroelectric | 88 | 1955 | n/a |
| 10 | Out of service, returning | Conventional Hydroelectric | 88 | 1955 | n/a |
| 11 | Out of service, returning | Conventional Hydroelectric | 88 | 1955 | n/a |
| 12 | Out of service, returning | Conventional Hydroelectric | 88 | 1955 | n/a |
| 6 | Operating | Conventional Hydroelectric | 88 | 1956 | n/a |
| 7 | Out of service | Conventional Hydroelectric | 88 | 1956 | n/a |
| 8 | Out of service | Conventional Hydroelectric | 88 | 1956 | n/a |
| 5 | Operating | Conventional Hydroelectric | 88 | 1957 | n/a |
| 13 | Out of service, returning | Conventional Hydroelectric | 88 | 1957 | n/a |
| 14 | Operating | Conventional Hydroelectric | 88 | 1957 | n/a |
| 15 | Operating | Conventional Hydroelectric | 88 | 1957 | n/a |
| 16 | Operating | Conventional Hydroelectric | 88 | 1957 | n/a |
| 1 | Operating | Conventional Hydroelectric | 88 | 1958 | n/a |
| 2 | Operating | Conventional Hydroelectric | 88 | 1958 | n/a |
| 3 | Operating | Conventional Hydroelectric | 88 | 1958 | n/a |
| 4 | Operating | Conventional Hydroelectric | 88 | 1958 | n/a |
| 17 | Operating | Conventional Hydroelectric | 95 | 1977 | n/a |
| 18 | Operating | Conventional Hydroelectric | 95 | 1977 | n/a |
| 19 | Out of service, returning | Conventional Hydroelectric | 95 | 1977 | n/a |
| 20 | Operating | Conventional Hydroelectric | 95 | 1978 | n/a |
| 21 | Operating | Conventional Hydroelectric | 95 | 1978 | n/a |
| 22 | Operating | Conventional Hydroelectric | 95 | 1978 | n/a |
| 23 | Operating | Conventional Hydroelectric | 95 | 1978 | n/a |
| 24 | Operating | Conventional Hydroelectric | 95 | 1979 | n/a |
| 25 | Operating | Conventional Hydroelectric | 95 | 1979 | n/a |
| 26 | Operating | Conventional Hydroelectric | 95 | 1979 | n/a |
| 27 | Operating | Conventional Hydroelectric | 95 | 1979 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Chief Joseph plant?
EIA lists no joint owners for Chief Joseph. USACE Northwestern Division operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Chief Joseph plant?
Chief Joseph is in Bridgeport, Douglas County, Washington, at 47.9951° N, 119.6404° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Washington are similar in size?
Washington has 73 operable hydro plants with 21,462 MW of capacity, and Chief Joseph's 2,456 MW is 11% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Chief Joseph | Douglas | 2,456 | 9,806,156 |
| Rocky Reach | Chelan | 1,349 | 5,241,117 |
Source: EIA Forms EIA-860 and EIA-923, 2025.