Rocky Reach hydroelectric power plant, Washington

Rocky Reach is a 1,349 MW hydro power plant in Chelan County, Washington, operated by PUD No 1 of Chelan County-(WA), and it generated 5,241,117 MWh in 2025 (Forms EIA-860 and EIA-923). That is 5.2% of the generation reported in Washington, and its capacity factor sits at the 82nd percentile of U.S. hydro plants. By 2025 generation it ranks 209th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,349 MWNameplate capacity
48%Capacity factor, 2025, 82nd percentile, on 1,254 MW net summer
5.2%Of WA generation, 2025
59 yearsAverage generator age, by MW

How hard does the Rocky Reach plant run compared with other hydro plants?

The Rocky Reach plant had a capacity factor of 48% in 2025 on 1,254 MW of net summer capacity, the 82nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 174 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rocky Reach48%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Rocky Reach plant generating more or less than last year?

Generation at Rocky Reach rose 6.9% from 2024 to 2025, from 4,901,113 MWh to 5,241,117 MWh. Through August 2026 it is running 32.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20244,901,113
20255,241,117
2026 through August4,764,970
2025, same months3,608,138
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026445,101
July 2026481,606
June 2026602,238
May 2026673,441
April 2026608,012
March 2026645,237
February 2026594,566
January 2026714,769
December 2025566,395
November 2025436,591
October 2025344,931
September 2025285,062
August 2025465,145
July 2025413,993
June 2025477,849
May 2025552,139
April 2025527,795
March 2025356,944
February 2025346,908
January 2025467,365
December 2024487,757
November 2024444,277
October 2024296,554
September 2024290,961
August 2024455,469
July 2024505,788
June 2024513,840
May 2024491,214
April 2024374,258
March 2024371,844
February 2024294,603
January 2024374,548

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Rocky Reach plant?

Rocky Reach made 5.2% of the 101,512,862 MWh reported by Washington plants in 2025, from 4.3% of the state's 31,712 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 3rd largest of 139 plants in Washington, the 173rd largest of 14,327 in the U.S. and the 6th largest of 1,393 hydro plants. By 2025 generation it is the 4th largest of 129 generating plants in the state.

Rocky Reach within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)1,34931,7124.3%
Generation (MWh)5,241,117101,512,8625.2%
Hydro capacity (MW)1,34921,4626.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rocky Reach plant, and when do they retire?

11 operable generators total 1,349 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s779859%none reported
1970s455141%none reported
Every generator, 11 in all
UnitStatusTechnologyMWIn servicePlanned retirement
C-1OperatingConventional Hydroelectric1141961n/a
C-2OperatingConventional Hydroelectric1141961n/a
C-3OperatingConventional Hydroelectric1141961n/a
C-4OperatingConventional Hydroelectric1141961n/a
C-5OperatingConventional Hydroelectric1141961n/a
C-6OperatingConventional Hydroelectric1141961n/a
C-7OperatingConventional Hydroelectric1141961n/a
C-8OperatingConventional Hydroelectric1381973n/a
C-9OperatingConventional Hydroelectric1381973n/a
C-10OperatingConventional Hydroelectric1381974n/a
C-11OperatingConventional Hydroelectric1381974n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rocky Reach plant?

EIA lists no joint owners for Rocky Reach. PUD No 1 of Chelan County-(WA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PUD No 1 of Chelan County charge homes?

PUD No 1 of Chelan County, the operator of Rocky Reach, had an average residential price of 3.78¢ per kWh and an average bill of $66 a month in 2025, 71% below the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
PUD No 1 of Chelan County3.78¢$6671% lower
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Rocky Reach plant?

Rocky Reach is in Wenatchee, Chelan County, Washington, at 47.5336° N, 120.2953° W. It sits in the Public Utility District No. 1 of Chelan County balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Rocky Reach's 1,349 MW is 6% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Chief JosephDouglas2,4569,806,156
Rocky ReachChelan1,3495,241,117
WanapumGrant1,2204,437,537
BoundaryPend Oreille1,1603,099,497
Priest RapidsGrant9504,164,860

Source: EIA Forms EIA-860 and EIA-923, 2025.