Hydro power plant, Washington

Boundary hydroelectric power plant, Washington

Boundary is a 1,160 MW hydro power plant in Pend Oreille County, Washington, operated by City of Seattle-(WA), and it generated 3,099,497 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.1% of the generation reported in Washington, and its capacity factor sits at the 45th percentile of U.S. hydro plants. By 2025 generation it ranks 383rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,160 MWNameplate capacity
31%Capacity factor, 2025, 45th percentile, on 1,145 MW net summer
3.1%Of WA generation, 2025
50 yearsAverage generator age, by MW

How hard does the Boundary plant run compared with other hydro plants?

The Boundary plant had a capacity factor of 31% in 2025 on 1,145 MW of net summer capacity, the 45th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Boundary31%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Boundary plant generating more or less than last year?

Generation at Boundary rose 2.6% from 2024 to 2025, from 3,020,283 MWh to 3,099,497 MWh. Through August 2026 it is running 49.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20243,020,283
20253,099,497
2026 through August3,082,282
2025, same months2,064,539
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026134,990
July 2026349,377
June 2026493,831
May 2026530,253
April 2026482,447
March 2026393,601
February 2026322,734
January 2026375,049
December 2025393,771
November 2025216,983
October 2025278,461
September 2025145,743
August 2025134,557
July 2025173,900
June 2025313,221
May 2025480,995
April 2025375,959
March 2025213,864
February 2025166,239
January 2025205,804
December 2024181,845
November 2024199,563
October 2024269,165
September 2024138,906
August 2024135,421
July 2024261,164
June 2024434,249
May 2024401,290
April 2024249,073
March 2024286,878
February 2024242,583
January 2024220,146

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Boundary plant?

Boundary made 3.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 3.7% of the state's 31,712 MW of capacity. By capacity it is the 6th largest of 139 plants in Washington, the 241st largest of 14,327 in the U.S. and the 10th largest of 1,393 hydro plants. By 2025 generation it is the 10th largest of 129 generating plants in the state.

Boundary within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)1,16031,7123.7%
Generation (MWh)3,099,497101,512,8623.1%
Hydro capacity (MW)1,16021,4625.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Boundary plant, and when do they retire?

6 operable generators total 1,160 MW, with an average age of 50 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s468159%none reported
1980s247941%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
51OperatingConventional Hydroelectric1811967n/a
52OperatingConventional Hydroelectric1621967n/a
53OperatingConventional Hydroelectric1581967n/a
54OperatingConventional Hydroelectric1811967n/a
55OperatingConventional Hydroelectric2391985n/a
56OperatingConventional Hydroelectric2391986n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Boundary plant?

EIA lists no joint owners for Boundary. City of Seattle-(WA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Seattle charge homes?

City of Seattle, the operator of Boundary, had an average residential price of 14.74¢ per kWh and an average bill of $87 a month in 2025, 12% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
City of Seattle14.74¢$8712% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Boundary plant?

Boundary is in Metaline, Pend Oreille County, Washington, at 48.9871° N, 117.3478° W. It sits in the Seattle City Light balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Boundary's 1,160 MW is 5% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Rocky ReachChelan1,3495,241,117
WanapumGrant1,2204,437,537
BoundaryPend Oreille1,1603,099,497
Priest RapidsGrant9504,164,860
WellsChelan8673,707,938
Little GooseColumbia8101,589,274

Source: EIA Forms EIA-860 and EIA-923, 2025.