Hydro power plant, Washington
Little Goose hydroelectric power plant, Washington
Little Goose is a 810 MW hydro power plant in Columbia County, Washington, operated by USACE Northwestern Division, and it generated 1,589,274 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.6% of the generation reported in Washington, and its capacity factor sits at the 26th percentile of U.S. hydro plants. By 2025 generation it ranks 580th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Little Goose plant run compared with other hydro plants?
The Little Goose plant had a capacity factor of 22% in 2025 on 810 MW of net summer capacity, the 26th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 82 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Little Goose | 22% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Little Goose plant generating more or less than last year?
Generation at Little Goose rose 10.2% from 2024 to 2025, from 1,441,695 MWh to 1,589,274 MWh. Through August 2026 it is running 2.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,441,695 |
| 2025 | 1,589,274 |
| 2026 through August | 1,109,310 |
| 2025, same months | 1,135,605 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 78,288 |
| July 2026 | 112,891 |
| June 2026 | 99,606 |
| May 2026 | 124,404 |
| April 2026 | 93,104 |
| March 2026 | 264,709 |
| February 2026 | 138,317 |
| January 2026 | 197,991 |
| December 2025 | 184,058 |
| November 2025 | 92,848 |
| October 2025 | 86,293 |
| September 2025 | 90,470 |
| August 2025 | 80,916 |
| July 2025 | 107,042 |
| June 2025 | 120,568 |
| May 2025 | 151,820 |
| April 2025 | 109,638 |
| March 2025 | 276,661 |
| February 2025 | 139,921 |
| January 2025 | 149,039 |
| December 2024 | 97,660 |
| November 2024 | 87,248 |
| October 2024 | 79,981 |
| September 2024 | 93,327 |
| August 2024 | 94,189 |
| July 2024 | 117,432 |
| June 2024 | 139,171 |
| May 2024 | 141,502 |
| April 2024 | 99,115 |
| March 2024 | 193,848 |
| February 2024 | 171,485 |
| January 2024 | 126,737 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Little Goose plant, and when do they retire?
6 operable generators total 810 MW, with an average age of 51 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 6 | 810 | 100% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 135 | 1970 | n/a |
| 2 | Operating | Conventional Hydroelectric | 135 | 1970 | n/a |
| 3 | Out of service, returning | Conventional Hydroelectric | 135 | 1971 | n/a |
| 4 | Operating | Conventional Hydroelectric | 135 | 1978 | n/a |
| 5 | Out of service, returning | Conventional Hydroelectric | 135 | 1978 | n/a |
| 6 | Operating | Conventional Hydroelectric | 135 | 1978 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Little Goose plant?
EIA lists no joint owners for Little Goose. USACE Northwestern Division operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Little Goose plant?
Little Goose is in Dayton, Columbia County, Washington, at 46.5838° N, 118.0273° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Washington are similar in size?
Washington has 73 operable hydro plants with 21,462 MW of capacity, and Little Goose's 810 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Boundary | Pend Oreille | 1,160 | 3,099,497 |
| Priest Rapids | Grant | 950 | 4,164,860 |
| Wells | Chelan | 867 | 3,707,938 |
| Little Goose | Columbia | 810 | 1,589,274 |
| Lower Monumental | Walla Walla | 810 | 1,476,976 |
| Lower Granite | Whitman | 810 | 1,461,002 |
| Rock Island | Chelan | 629 | 2,226,611 |
Source: EIA Forms EIA-860 and EIA-923, 2025.