Hydro power plant, Washington
Lower Granite hydroelectric power plant, Washington
Lower Granite is a 810 MW hydro power plant in Whitman County, Washington, operated by USACE Northwestern Division, and it generated 1,461,002 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Washington, and its capacity factor sits at the 22nd percentile of U.S. hydro plants. By 2025 generation it ranks 608th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lower Granite plant run compared with other hydro plants?
The Lower Granite plant had a capacity factor of 21% in 2025 on 802 MW of net summer capacity, the 22nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 76 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lower Granite | 21% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lower Granite plant generating more or less than last year?
Generation at Lower Granite rose 14.7% from 2024 to 2025, from 1,273,521 MWh to 1,461,002 MWh. Through August 2026 it is running 0.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,273,521 |
| 2025 | 1,461,002 |
| 2026 through August | 1,007,340 |
| 2025, same months | 1,004,502 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 65,418 |
| July 2026 | 82,472 |
| June 2026 | 68,690 |
| May 2026 | 68,695 |
| April 2026 | 80,882 |
| March 2026 | 292,034 |
| February 2026 | 143,039 |
| January 2026 | 206,110 |
| December 2025 | 191,370 |
| November 2025 | 93,248 |
| October 2025 | 84,192 |
| September 2025 | 87,690 |
| August 2025 | 86,267 |
| July 2025 | 77,691 |
| June 2025 | 81,523 |
| May 2025 | 86,559 |
| April 2025 | 84,368 |
| March 2025 | 281,195 |
| February 2025 | 154,580 |
| January 2025 | 152,319 |
| December 2024 | 106,142 |
| November 2024 | 87,356 |
| October 2024 | 76,806 |
| September 2024 | 93,934 |
| August 2024 | 94,960 |
| July 2024 | 90,424 |
| June 2024 | 104,712 |
| May 2024 | 78,464 |
| April 2024 | 71,557 |
| March 2024 | 192,364 |
| February 2024 | 161,029 |
| January 2024 | 115,773 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lower Granite plant, and when do they retire?
6 operable generators total 810 MW, with an average age of 49 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 6 | 810 | 100% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Out of service, returning | Conventional Hydroelectric | 135 | 1975 | n/a |
| 2 | Operating | Conventional Hydroelectric | 135 | 1975 | n/a |
| 3 | Operating | Conventional Hydroelectric | 135 | 1975 | n/a |
| 4 | Operating | Conventional Hydroelectric | 135 | 1978 | n/a |
| 5 | Operating | Conventional Hydroelectric | 135 | 1978 | n/a |
| 6 | Operating | Conventional Hydroelectric | 135 | 1978 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lower Granite plant?
EIA lists no joint owners for Lower Granite. USACE Northwestern Division operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lower Granite plant?
Lower Granite is in Pomeroy, Whitman County, Washington, at 46.6595° N, 117.4294° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Washington are similar in size?
Washington has 73 operable hydro plants with 21,462 MW of capacity, and Lower Granite's 810 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Wells | Chelan | 867 | 3,707,938 |
| Little Goose | Columbia | 810 | 1,589,274 |
| Lower Monumental | Walla Walla | 810 | 1,476,976 |
| Lower Granite | Whitman | 810 | 1,461,002 |
| Rock Island | Chelan | 629 | 2,226,611 |
| Ice Harbor | Walla Walla | 603 | 1,511,186 |
| Ross | Whatcom | 450 | 531,608 |
Source: EIA Forms EIA-860 and EIA-923, 2025.