Hydro power plant, Washington

Lower Granite hydroelectric power plant, Washington

Lower Granite is a 810 MW hydro power plant in Whitman County, Washington, operated by USACE Northwestern Division, and it generated 1,461,002 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Washington, and its capacity factor sits at the 22nd percentile of U.S. hydro plants. By 2025 generation it ranks 608th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

810 MWNameplate capacity
21%Capacity factor, 2025, 22nd percentile, on 802 MW net summer
1.4%Of WA generation, 2025
49 yearsAverage generator age, by MW

How hard does the Lower Granite plant run compared with other hydro plants?

The Lower Granite plant had a capacity factor of 21% in 2025 on 802 MW of net summer capacity, the 22nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lower Granite21%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lower Granite plant generating more or less than last year?

Generation at Lower Granite rose 14.7% from 2024 to 2025, from 1,273,521 MWh to 1,461,002 MWh. Through August 2026 it is running 0.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,273,521
20251,461,002
2026 through August1,007,340
2025, same months1,004,502
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202665,418
July 202682,472
June 202668,690
May 202668,695
April 202680,882
March 2026292,034
February 2026143,039
January 2026206,110
December 2025191,370
November 202593,248
October 202584,192
September 202587,690
August 202586,267
July 202577,691
June 202581,523
May 202586,559
April 202584,368
March 2025281,195
February 2025154,580
January 2025152,319
December 2024106,142
November 202487,356
October 202476,806
September 202493,934
August 202494,960
July 202490,424
June 2024104,712
May 202478,464
April 202471,557
March 2024192,364
February 2024161,029
January 2024115,773

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Lower Granite plant?

Lower Granite made 1.4% of the 101,512,862 MWh reported by Washington plants in 2025, from 2.6% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 9th largest of 139 plants in Washington, the 401st largest of 14,327 in the U.S. and the 19th largest of 1,393 hydro plants. By 2025 generation it is the 19th largest of 129 generating plants in the state.

Lower Granite within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)81031,7122.6%
Generation (MWh)1,461,002101,512,8621.4%
Hydro capacity (MW)81021,4623.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lower Granite plant, and when do they retire?

6 operable generators total 810 MW, with an average age of 49 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s6810100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1Out of service, returningConventional Hydroelectric1351975n/a
2OperatingConventional Hydroelectric1351975n/a
3OperatingConventional Hydroelectric1351975n/a
4OperatingConventional Hydroelectric1351978n/a
5OperatingConventional Hydroelectric1351978n/a
6OperatingConventional Hydroelectric1351978n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lower Granite plant?

EIA lists no joint owners for Lower Granite. USACE Northwestern Division operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Lower Granite plant?

Lower Granite is in Pomeroy, Whitman County, Washington, at 46.6595° N, 117.4294° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Lower Granite's 810 MW is 4% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
WellsChelan8673,707,938
Little GooseColumbia8101,589,274
Lower MonumentalWalla Walla8101,476,976
Lower GraniteWhitman8101,461,002
Rock IslandChelan6292,226,611
Ice HarborWalla Walla6031,511,186
RossWhatcom450531,608

Source: EIA Forms EIA-860 and EIA-923, 2025.