Hydro power plant, Washington

Ross hydroelectric power plant, Washington

Ross is a 450 MW hydro power plant in Whatcom County, Washington, operated by City of Seattle-(WA), and it generated 531,608 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Washington, and its capacity factor sits at the 9th percentile of U.S. hydro plants. By 2025 generation it ranks 1,278th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

450 MWNameplate capacity
13%Capacity factor, 2025, 9th percentile, on 450 MW net summer
0.5%Of WA generation, 2025
71 yearsAverage generator age, by MW

How hard does the Ross plant run compared with other hydro plants?

The Ross plant had a capacity factor of 13% in 2025 on 450 MW of net summer capacity, the 9th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 49 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ross13%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ross plant generating more or less than last year?

Generation at Ross rose 29.6% from 2024 to 2025, from 410,106 MWh to 531,608 MWh. Through August 2026 it is running 95.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024410,106
2025531,608
2026 through August472,607
2025, same months241,701
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,008
July 202635,873
June 202660,195
May 202634,527
April 202639,484
March 202657,248
February 2026100,224
January 2026123,048
December 2025168,037
November 202532,150
October 202546,650
September 202543,070
August 202522,697
July 202522,469
June 202525,256
May 202526,749
April 202530,344
March 202531,780
February 202542,558
January 202539,848
December 202435,605
November 202441,834
October 202437,500
September 202438,895
August 202428,123
July 202419,043
June 202417,065
May 202429,053
April 202444,335
March 202444,222
February 202431,175
January 202443,256

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Ross plant?

Ross made 0.5% of the 101,512,862 MWh reported by Washington plants in 2025, from 1.4% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 17th largest of 139 plants in Washington, the 793rd largest of 14,327 in the U.S. and the 32nd largest of 1,393 hydro plants. By 2025 generation it is the 33rd largest of 129 generating plants in the state.

Ross within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)45031,7121.4%
Generation (MWh)531,608101,512,8620.5%
Hydro capacity (MW)45021,4622.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ross plant, and when do they retire?

4 operable generators total 450 MW, with an average age of 71 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s4450100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
44OperatingConventional Hydroelectric1131952n/a
43OperatingConventional Hydroelectric1131953n/a
42OperatingConventional Hydroelectric1131954n/a
41OperatingConventional Hydroelectric1131956n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ross plant?

EIA lists no joint owners for Ross. City of Seattle-(WA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Seattle charge homes?

City of Seattle, the operator of Ross, had an average residential price of 14.74¢ per kWh and an average bill of $87 a month in 2025, 12% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
City of Seattle14.74¢$8712% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Ross plant?

Ross is in Rockport, Whatcom County, Washington, at 48.7326° N, 121.0679° W. It sits in the Seattle City Light balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Ross' 450 MW is 2% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Lower GraniteWhitman8101,461,002
Rock IslandChelan6292,226,611
Ice HarborWalla Walla6031,511,186
RossWhatcom450531,608
MossyrockLewis300902,717
Swift 1Skamania240534,663