Swift 1 hydroelectric power plant, Washington

Swift 1 is a 240 MW hydro power plant in Skamania County, Washington, operated by PacifiCorp, and it generated 534,663 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Washington, and its capacity factor sits at the 28th percentile of U.S. hydro plants. By 2025 generation it ranks 1,276th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

240 MWNameplate capacity
23%Capacity factor, 2025, 28th percentile, on 264 MW net summer
0.5%Of WA generation, 2025
67 yearsAverage generator age, by MW

How hard does the Swift 1 plant run compared with other hydro plants?

The Swift 1 plant had a capacity factor of 23% in 2025 on 264 MW of net summer capacity, the 28th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 84 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Swift 123%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Swift 1 plant generating more or less than last year?

Generation at Swift 1 rose 2.9% from 2024 to 2025, from 519,481 MWh to 534,663 MWh. Through August 2026 it is running 5.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024519,481
2025534,663
2026 through August323,807
2025, same months343,658
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,768
July 202617,352
June 202633,777
May 202632,738
April 202631,564
March 202695,254
February 202657,479
January 202641,875
December 2025130,704
November 202536,441
October 202522,096
September 20251,764
August 20252,584
July 202517,334
June 202538,188
May 202539,283
April 202565,436
March 202578,564
February 202526,312
January 202575,957
December 202459,251
November 202446,489
October 20247,974
September 202435,310
August 202428,768
July 202432,426
June 202443,348
May 202454,024
April 202437,155
March 202432,956
February 202471,492
January 202470,288

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Swift 1 plant?

Swift 1 made 0.5% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.8% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 29th largest of 139 plants in Washington, the 1,316th largest of 14,327 in the U.S. and the 60th largest of 1,393 hydro plants. By 2025 generation it is the 32nd largest of 129 generating plants in the state.

Swift 1 within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)24031,7120.8%
Generation (MWh)534,663101,512,8620.5%
Hydro capacity (MW)24021,4621.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Swift 1 plant, and when do they retire?

3 operable generators total 240 MW, with an average age of 67 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s3240100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HY11OperatingConventional Hydroelectric801958n/a
HY12OperatingConventional Hydroelectric801958n/a
HY13OperatingConventional Hydroelectric801958n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Swift 1 plant?

EIA lists no joint owners for Swift 1. PacifiCorp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PacifiCorp charge homes?

PacifiCorp, the operator of Swift 1, had an average residential price of 14.33¢ per kWh and an average bill of $167 a month in 2025, 9% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
PacifiCorp14.33¢$1679% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Swift 1 plant?

Swift 1 is in Cougar, Skamania County, Washington, at 46.0608° N, 122.2017° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Swift 1's 240 MW is 1% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
RossWhatcom450531,608
MossyrockLewis300902,717
Swift 1Skamania240534,663
GorgeWhatcom207768,952
DiabloWhatcom182518,187
MayfieldLewis162602,506

Source: EIA Forms EIA-860 and EIA-923, 2025.