Hydro power plant, Washington
Swift 1 hydroelectric power plant, Washington
Swift 1 is a 240 MW hydro power plant in Skamania County, Washington, operated by PacifiCorp, and it generated 534,663 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Washington, and its capacity factor sits at the 28th percentile of U.S. hydro plants. By 2025 generation it ranks 1,276th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Swift 1 plant run compared with other hydro plants?
The Swift 1 plant had a capacity factor of 23% in 2025 on 264 MW of net summer capacity, the 28th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 84 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Swift 1 | 23% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Swift 1 plant generating more or less than last year?
Generation at Swift 1 rose 2.9% from 2024 to 2025, from 519,481 MWh to 534,663 MWh. Through August 2026 it is running 5.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 519,481 |
| 2025 | 534,663 |
| 2026 through August | 323,807 |
| 2025, same months | 343,658 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,768 |
| July 2026 | 17,352 |
| June 2026 | 33,777 |
| May 2026 | 32,738 |
| April 2026 | 31,564 |
| March 2026 | 95,254 |
| February 2026 | 57,479 |
| January 2026 | 41,875 |
| December 2025 | 130,704 |
| November 2025 | 36,441 |
| October 2025 | 22,096 |
| September 2025 | 1,764 |
| August 2025 | 2,584 |
| July 2025 | 17,334 |
| June 2025 | 38,188 |
| May 2025 | 39,283 |
| April 2025 | 65,436 |
| March 2025 | 78,564 |
| February 2025 | 26,312 |
| January 2025 | 75,957 |
| December 2024 | 59,251 |
| November 2024 | 46,489 |
| October 2024 | 7,974 |
| September 2024 | 35,310 |
| August 2024 | 28,768 |
| July 2024 | 32,426 |
| June 2024 | 43,348 |
| May 2024 | 54,024 |
| April 2024 | 37,155 |
| March 2024 | 32,956 |
| February 2024 | 71,492 |
| January 2024 | 70,288 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Swift 1 plant, and when do they retire?
3 operable generators total 240 MW, with an average age of 67 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 3 | 240 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HY11 | Operating | Conventional Hydroelectric | 80 | 1958 | n/a |
| HY12 | Operating | Conventional Hydroelectric | 80 | 1958 | n/a |
| HY13 | Operating | Conventional Hydroelectric | 80 | 1958 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Swift 1 plant?
EIA lists no joint owners for Swift 1. PacifiCorp operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does PacifiCorp charge homes?
PacifiCorp, the operator of Swift 1, had an average residential price of 14.33¢ per kWh and an average bill of $167 a month in 2025, 9% above the Washington average of 13.17¢.
| Measure | Price | Monthly bill | Against Washington |
|---|---|---|---|
| PacifiCorp | 14.33¢ | $167 | 9% higher |
| Washington average | 13.17¢ | $124 | |
| U.S. average | 17.23¢ | $151 | 31% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Swift 1 plant?
Swift 1 is in Cougar, Skamania County, Washington, at 46.0608° N, 122.2017° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Washington are similar in size?
Washington has 73 operable hydro plants with 21,462 MW of capacity, and Swift 1's 240 MW is 1% of that.
Source: EIA Forms EIA-860 and EIA-923, 2025.