Skip to main content
RateWatt

Hydro power plant, Washington

Lower Monumental hydroelectric power plant, Washington

Lower Monumental is a 810 MW hydro power plant in Walla Walla County, Washington, operated by USACE Northwestern Division, and it generated 1,476,976 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Washington, and its capacity factor sits at the 23rd percentile of U.S. hydro plants. By 2025 generation it ranks 602nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

810 MWNameplate capacity
21%Capacity factor, 2025, 23rd percentile, on 810 MW net summer
1.5%Of WA generation, 2025
51 yearsAverage generator age, by MW

How hard does the Lower Monumental plant run compared with other hydro plants?

The Lower Monumental plant had a capacity factor of 21% in 2025 on 810 MW of net summer capacity, the 23rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lower Monumental21%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lower Monumental plant generating more or less than last year?

Generation at Lower Monumental rose 15.3% from 2024 to 2025, from 1,281,014 MWh to 1,476,976 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,281,014
20251,476,976
2026 through August1,037,174
2025, same months1,010,243
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202668,501
July 202681,360
June 202669,529
May 202670,463
April 202682,274
March 2026309,070
February 2026146,730
January 2026209,247
December 2025195,855
November 202594,409
October 202585,835
September 202590,634
August 202561,677
July 202578,530
June 202582,700
May 202587,783
April 202587,740
March 2025294,481
February 2025162,291
January 2025155,041
December 2024104,819
November 202489,639
October 202479,313
September 202492,750
August 202490,184
July 202488,691
June 2024101,305
May 202451,680
April 202472,038
March 2024199,707
February 2024178,237
January 2024132,651

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Lower Monumental plant?

Lower Monumental made 1.5% of the 101,512,862 MWh reported by Washington plants in 2025, from 2.6% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 9th largest of 139 plants in Washington, the 401st largest of 14,327 in the U.S. and the 18th largest of 1,393 hydro plants. By 2025 generation it is the 18th largest of 129 generating plants in the state.

Lower Monumental within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)81031,7122.6%
Generation (MWh)1,476,976101,512,8621.5%
Hydro capacity (MW)81021,4623.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lower Monumental plant, and when do they retire?

6 operable generators total 810 MW, with an average age of 51 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s227033%none reported
1970s454067%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric1351969n/a
2Out of service, returningConventional Hydroelectric1351969n/a
3OperatingConventional Hydroelectric1351970n/a
4OperatingConventional Hydroelectric1351979n/a
5OperatingConventional Hydroelectric1351979n/a
6OperatingConventional Hydroelectric1351979n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lower Monumental plant?

EIA lists no joint owners for Lower Monumental. USACE Northwestern Division operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Lower Monumental plant?

Lower Monumental is in Kahlotus, Walla Walla County, Washington, at 46.5635° N, 118.5397° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Lower Monumental's 810 MW is 4% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Priest RapidsGrant9504,164,860
WellsChelan8673,707,938
Little GooseColumbia8101,589,274
Lower MonumentalWalla Walla8101,476,976
Lower GraniteWhitman8101,461,002
Rock IslandChelan6292,226,611
Ice HarborWalla Walla6031,511,186

Source: EIA Forms EIA-860 and EIA-923, 2025.