Hydro power plant, Washington
Lower Monumental hydroelectric power plant, Washington
Lower Monumental is a 810 MW hydro power plant in Walla Walla County, Washington, operated by USACE Northwestern Division, and it generated 1,476,976 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Washington, and its capacity factor sits at the 23rd percentile of U.S. hydro plants. By 2025 generation it ranks 602nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lower Monumental plant run compared with other hydro plants?
The Lower Monumental plant had a capacity factor of 21% in 2025 on 810 MW of net summer capacity, the 23rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 76 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lower Monumental | 21% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lower Monumental plant generating more or less than last year?
Generation at Lower Monumental rose 15.3% from 2024 to 2025, from 1,281,014 MWh to 1,476,976 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,281,014 |
| 2025 | 1,476,976 |
| 2026 through August | 1,037,174 |
| 2025, same months | 1,010,243 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 68,501 |
| July 2026 | 81,360 |
| June 2026 | 69,529 |
| May 2026 | 70,463 |
| April 2026 | 82,274 |
| March 2026 | 309,070 |
| February 2026 | 146,730 |
| January 2026 | 209,247 |
| December 2025 | 195,855 |
| November 2025 | 94,409 |
| October 2025 | 85,835 |
| September 2025 | 90,634 |
| August 2025 | 61,677 |
| July 2025 | 78,530 |
| June 2025 | 82,700 |
| May 2025 | 87,783 |
| April 2025 | 87,740 |
| March 2025 | 294,481 |
| February 2025 | 162,291 |
| January 2025 | 155,041 |
| December 2024 | 104,819 |
| November 2024 | 89,639 |
| October 2024 | 79,313 |
| September 2024 | 92,750 |
| August 2024 | 90,184 |
| July 2024 | 88,691 |
| June 2024 | 101,305 |
| May 2024 | 51,680 |
| April 2024 | 72,038 |
| March 2024 | 199,707 |
| February 2024 | 178,237 |
| January 2024 | 132,651 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lower Monumental plant, and when do they retire?
6 operable generators total 810 MW, with an average age of 51 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 2 | 270 | 33% | none reported |
| 1970s | 4 | 540 | 67% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 135 | 1969 | n/a |
| 2 | Out of service, returning | Conventional Hydroelectric | 135 | 1969 | n/a |
| 3 | Operating | Conventional Hydroelectric | 135 | 1970 | n/a |
| 4 | Operating | Conventional Hydroelectric | 135 | 1979 | n/a |
| 5 | Operating | Conventional Hydroelectric | 135 | 1979 | n/a |
| 6 | Operating | Conventional Hydroelectric | 135 | 1979 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lower Monumental plant?
EIA lists no joint owners for Lower Monumental. USACE Northwestern Division operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lower Monumental plant?
Lower Monumental is in Kahlotus, Walla Walla County, Washington, at 46.5635° N, 118.5397° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Washington are similar in size?
Washington has 73 operable hydro plants with 21,462 MW of capacity, and Lower Monumental's 810 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Priest Rapids | Grant | 950 | 4,164,860 |
| Wells | Chelan | 867 | 3,707,938 |
| Little Goose | Columbia | 810 | 1,589,274 |
| Lower Monumental | Walla Walla | 810 | 1,476,976 |
| Lower Granite | Whitman | 810 | 1,461,002 |
| Rock Island | Chelan | 629 | 2,226,611 |
| Ice Harbor | Walla Walla | 603 | 1,511,186 |
Source: EIA Forms EIA-860 and EIA-923, 2025.