Skip to main content
RateWatt

Hydro power plant, Washington

Priest Rapids hydroelectric power plant, Washington

Priest Rapids is a 950 MW hydro power plant in Grant County, Washington, operated by PUD No 2 of Grant County-(WA), and it generated 4,164,860 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.1% of the generation reported in Washington, and its capacity factor sits at the 86th percentile of U.S. hydro plants. By 2025 generation it ranks 272nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

950 MWNameplate capacity
50%Capacity factor, 2025, 86th percentile, on 950 MW net summer
4.1%Of WA generation, 2025
65 yearsAverage generator age, by MW

How hard does the Priest Rapids plant run compared with other hydro plants?

The Priest Rapids plant had a capacity factor of 50% in 2025 on 950 MW of net summer capacity, the 86th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 183 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Priest Rapids50%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Priest Rapids plant generating more or less than last year?

Generation at Priest Rapids rose 8.5% from 2024 to 2025, from 3,837,773 MWh to 4,164,860 MWh. Through August 2026 it is running 27.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20243,837,773
20254,164,860
2026 through August3,573,114
2025, same months2,793,527
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026336,477
July 2026354,775
June 2026432,604
May 2026465,774
April 2026441,899
March 2026493,421
February 2026485,258
January 2026562,906
December 2025504,581
November 2025350,170
October 2025280,202
September 2025236,380
August 2025384,730
July 2025288,417
June 2025364,948
May 2025387,906
April 2025377,790
March 2025303,734
February 2025294,951
January 2025391,051
December 2024412,517
November 2024330,525
October 2024248,643
September 2024249,275
August 2024344,167
July 2024377,191
June 2024385,159
May 2024327,172
April 2024253,477
March 2024323,742
February 2024265,248
January 2024320,657

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Priest Rapids plant?

Priest Rapids made 4.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 3.0% of the state's 31,712 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 7th largest of 139 plants in Washington, the 329th largest of 14,327 in the U.S. and the 14th largest of 1,393 hydro plants. By 2025 generation it is the 6th largest of 129 generating plants in the state.

Priest Rapids within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)95031,7123.0%
Generation (MWh)4,164,860101,512,8624.1%
Hydro capacity (MW)95021,4624.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Priest Rapids plant, and when do they retire?

10 operable generators total 950 MW, with an average age of 65 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s328530%none reported
1960s766570%none reported
Every generator, 10 in all
UnitStatusTechnologyMWIn servicePlanned retirement
8OperatingConventional Hydroelectric951959n/a
9OperatingConventional Hydroelectric951959n/a
10OperatingConventional Hydroelectric951959n/a
3OperatingConventional Hydroelectric951960n/a
4OperatingConventional Hydroelectric951960n/a
5OperatingConventional Hydroelectric951960n/a
6OperatingConventional Hydroelectric951960n/a
7OperatingConventional Hydroelectric951960n/a
1OperatingConventional Hydroelectric951961n/a
2OperatingConventional Hydroelectric951961n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Priest Rapids plant?

EIA lists no joint owners for Priest Rapids. PUD No 2 of Grant County-(WA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PUD No 2 of Grant County charge homes?

PUD No 2 of Grant County, the operator of Priest Rapids, had an average residential price of 6.17¢ per kWh and an average bill of $101 a month in 2025, 53% below the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
PUD No 2 of Grant County6.17¢$10153% lower
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Priest Rapids plant?

Priest Rapids is in Mattawa, Grant County, Washington, at 46.6451° N, 119.9080° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Priest Rapids' 950 MW is 4% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Rocky ReachChelan1,3495,241,117
WanapumGrant1,2204,437,537
BoundaryPend Oreille1,1603,099,497
Priest RapidsGrant9504,164,860
WellsChelan8673,707,938
Little GooseColumbia8101,589,274
Lower MonumentalWalla Walla8101,476,976

Source: EIA Forms EIA-860 and EIA-923, 2025.