Hydro power plant, Washington

Wanapum hydroelectric power plant, Washington

Wanapum is a 1,220 MW hydro power plant in Grant County, Washington, operated by PUD No 2 of Grant County-(WA), and it generated 4,437,537 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.4% of the generation reported in Washington, and its capacity factor sits at the 69th percentile of U.S. hydro plants. By 2025 generation it ranks 252nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,220 MWNameplate capacity
42%Capacity factor, 2025, 69th percentile, on 1,220 MW net summer
4.4%Of WA generation, 2025
10 yearsAverage generator age, by MW

How hard does the Wanapum plant run compared with other hydro plants?

The Wanapum plant had a capacity factor of 42% in 2025 on 1,220 MW of net summer capacity, the 69th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 152 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wanapum42%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Wanapum plant generating more or less than last year?

Generation at Wanapum rose 9.5% from 2024 to 2025, from 4,052,946 MWh to 4,437,537 MWh. Through August 2026 it is running 32.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20244,052,946
20254,437,537
2026 through August3,948,580
2025, same months2,974,171
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026360,164
July 2026390,595
June 2026501,866
May 2026511,736
April 2026475,242
March 2026548,637
February 2026523,638
January 2026636,702
December 2025537,785
November 2025381,225
October 2025295,123
September 2025249,233
August 2025406,821
July 2025322,881
June 2025404,641
May 2025430,045
April 2025407,952
March 2025306,834
February 2025297,034
January 2025397,963
December 2024422,251
November 2024372,288
October 2024251,541
September 2024251,490
August 2024373,848
July 2024424,030
June 2024430,810
May 2024350,999
April 2024278,077
March 2024328,269
February 2024257,269
January 2024312,074

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Wanapum plant?

Wanapum made 4.4% of the 101,512,862 MWh reported by Washington plants in 2025, from 3.8% of the state's 31,712 MW of capacity. By capacity it is the 4th largest of 139 plants in Washington, the 216th largest of 14,327 in the U.S. and the 8th largest of 1,393 hydro plants. By 2025 generation it is the 5th largest of 129 generating plants in the state.

Wanapum within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)1,22031,7123.8%
Generation (MWh)4,437,537101,512,8624.4%
Hydro capacity (MW)1,22021,4625.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wanapum plant, and when do they retire?

10 operable generators total 1,220 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 10 have already retired, totalling 1,038 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s91,09890%none reported
2020s112210%none reported
Every generator, 20 in all
UnitStatusTechnologyMWIn servicePlanned retirement
7AOperatingConventional Hydroelectric1222011n/a
2AOperatingConventional Hydroelectric1222012n/a
5AOperatingConventional Hydroelectric1222012n/a
1AOperatingConventional Hydroelectric1222013n/a
10AOperatingConventional Hydroelectric1222014n/a
9AOperatingConventional Hydroelectric1222015n/a
6AOperatingConventional Hydroelectric1222016n/a
3AOperatingConventional Hydroelectric1222017n/a
8AOperatingConventional Hydroelectric1222018n/a
4AOperatingConventional Hydroelectric1222020n/a
1RetiredConventional Hydroelectric10419632012
2RetiredConventional Hydroelectric10419632012
3RetiredConventional Hydroelectric10419632016
4RetiredConventional Hydroelectric10419632019
5RetiredConventional Hydroelectric10419632011
6RetiredConventional Hydroelectric10419632015
7RetiredConventional Hydroelectric10419632010
8RetiredConventional Hydroelectric10419632017
10RetiredConventional Hydroelectric10419632013
9RetiredConventional Hydroelectric10419642014

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wanapum plant?

EIA lists no joint owners for Wanapum. PUD No 2 of Grant County-(WA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PUD No 2 of Grant County charge homes?

PUD No 2 of Grant County, the operator of Wanapum, had an average residential price of 6.17¢ per kWh and an average bill of $101 a month in 2025, 53% below the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
PUD No 2 of Grant County6.17¢$10153% lower
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Wanapum plant?

Wanapum is in Beverly, Grant County, Washington, at 46.8731° N, 119.9703° W. It sits in the Public Utility District No. 2 of Grant County, Washington balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Wanapum's 1,220 MW is 6% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Rocky ReachChelan1,3495,241,117
WanapumGrant1,2204,437,537
BoundaryPend Oreille1,1603,099,497
Priest RapidsGrant9504,164,860
WellsChelan8673,707,938

Source: EIA Forms EIA-860 and EIA-923, 2025.