Wind power plant, Kansas
Cimarron Wind Energy LLC power plant, Kansas
Cimarron Wind Energy LLC is a 166 MW wind power plant in Gray County, Kansas, operated by Cimarron Wind Energy LLC, and it generated 382,919 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Kansas, and its capacity factor sits at the 27th percentile of U.S. wind plants. By 2025 generation it ranks 1,643rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cimarron Wind Energy LLC plant run compared with other wind plants?
The Cimarron Wind Energy LLC plant had a capacity factor of 26% in 2025 on 166 MW of net summer capacity, the 27th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cimarron Wind Energy LLC | 26% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cimarron Wind Energy LLC plant generating more or less than last year?
Generation at Cimarron Wind Energy LLC fell 17.8% from 2024 to 2025, from 465,981 MWh to 382,919 MWh. Through August 2026 it is running 15.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 465,981 |
| 2025 | 382,919 |
| 2026 through August | 226,395 |
| 2025, same months | 269,135 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 23,425 |
| July 2026 | 25,872 |
| June 2026 | 48,195 |
| May 2026 | 25,874 |
| April 2026 | 33,837 |
| March 2026 | 25,872 |
| February 2026 | 19,520 |
| January 2026 | 23,800 |
| December 2025 | 21,080 |
| November 2025 | 25,872 |
| October 2025 | 35,344 |
| September 2025 | 31,488 |
| August 2025 | 39,456 |
| July 2025 | 34,016 |
| June 2025 | 38,136 |
| May 2025 | 41,492 |
| April 2025 | 30,690 |
| March 2025 | 34,761 |
| February 2025 | 23,648 |
| January 2025 | 26,936 |
| December 2024 | 35,779 |
| November 2024 | 41,858 |
| October 2024 | 21,368 |
| September 2024 | 43,632 |
| August 2024 | 38,208 |
| July 2024 | 34,456 |
| June 2024 | 35,005 |
| May 2024 | 56,463 |
| April 2024 | 55,890 |
| March 2024 | 50,689 |
| February 2024 | 22,256 |
| January 2024 | 30,377 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cimarron Wind Energy LLC plant, and when do they retire?
1 operable generator totals 166 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 166 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CPV1 | Operating | Onshore Wind Turbine | 166 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cimarron Wind Energy LLC plant?
EIA lists no joint owners for Cimarron Wind Energy LLC. Cimarron Wind Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Cimarron Wind Energy LLC plant?
Cimarron Wind Energy LLC is in Cimmaron, Gray County, Kansas, at 37.8739° N, 100.2803° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Kansas are similar in size?
Kansas has 52 operable wind plants with 9,714 MW of capacity, and Cimarron Wind Energy LLC's 166 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| East Fork Wind Project, LLC | Thomas | 196 | 703,679 |
| Bloom Wind | Ford | 178 | 582,327 |
| Ironwood Wind | Ford | 168 | 476,257 |
| Cimarron Wind Energy LLC | Gray | 166 | 382,919 |
| Flat Ridge 5 | Harper | 153 | 200,646 |
| Elk River Wind | Butler | 150 | 264,754 |
| Slate Creek Wind Project LLC | Sumner | 150 | 444,681 |
Source: EIA Forms EIA-860 and EIA-923, 2025.