Wind power plant, Kansas
Elk River Wind power plant, Kansas
Elk River Wind is a 150 MW wind power plant in Butler County, Kansas, operated by Avangrid Power LLC, and it generated 264,754 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Kansas, and its capacity factor sits at the 11th percentile of U.S. wind plants. By 2025 generation it ranks 2,137th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Elk River Wind plant run compared with other wind plants?
The Elk River Wind plant had a capacity factor of 20% in 2025 on 150 MW of net summer capacity, the 11th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 74 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Elk River Wind | 20% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Elk River Wind plant generating more or less than last year?
Generation at Elk River Wind fell 10.2% from 2024 to 2025, from 294,845 MWh to 264,754 MWh.
| Period | MWh |
|---|---|
| 2024 | 294,845 |
| 2025 | 264,754 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 40,046 |
| November 2025 | 18,443 |
| October 2025 | 27,198 |
| September 2025 | 14,086 |
| August 2025 | 18,561 |
| July 2025 | 24,870 |
| June 2025 | 15,313 |
| May 2025 | 20,922 |
| April 2025 | 22,139 |
| March 2025 | 20,124 |
| February 2025 | 21,343 |
| January 2025 | 21,709 |
| December 2024 | 29,887 |
| November 2024 | 24,662 |
| October 2024 | 30,347 |
| September 2024 | 15,288 |
| August 2024 | 24,368 |
| July 2024 | 22,422 |
| June 2024 | 26,364 |
| May 2024 | 24,291 |
| April 2024 | 27,249 |
| March 2024 | 26,617 |
| February 2024 | 26,922 |
| January 2024 | 16,428 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Elk River Wind plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 150 | 2005 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Elk River Wind plant?
EIA lists no joint owners for Elk River Wind. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Elk River Wind plant?
Elk River Wind is in Beaumont, Butler County, Kansas, at 37.5797° N, 96.5503° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Kansas are similar in size?
Kansas has 52 operable wind plants with 9,714 MW of capacity, and Elk River Wind's 150 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ironwood Wind | Ford | 168 | 476,257 |
| Cimarron Wind Energy LLC | Gray | 166 | 382,919 |
| Flat Ridge 5 | Harper | 153 | 200,646 |
| Elk River Wind | Butler | 150 | 264,754 |
| Slate Creek Wind Project LLC | Sumner | 150 | 444,681 |
| Spearville | Ford | 149 | 128,143 |
| Smoky Hills Wind Project Phase II | Lincoln | 149 | 220,425 |
Source: EIA Forms EIA-860 and EIA-923, 2025.