Hydro power plant, Oregon

Clearwater 2 hydroelectric power plant, Oregon

Clearwater 2 is a 26 MW hydro power plant in Douglas County, Oregon, operated by PacifiCorp, and it generated 30,491 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 7th percentile of U.S. hydro plants. By 2025 generation it ranks 4,727th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

26 MWNameplate capacity
11%Capacity factor, 2025, 7th percentile, on 31 MW net summer
4,727thU.S. rank by generation, 2025
72 yearsAverage generator age, by MW

How hard does the Clearwater 2 plant run compared with other hydro plants?

The Clearwater 2 plant had a capacity factor of 11% in 2025 on 31 MW of net summer capacity, the 7th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 41 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Clearwater 211%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Clearwater 2 plant generating more or less than last year?

Generation at Clearwater 2 fell 12.1% from 2024 to 2025, from 34,692 MWh to 30,491 MWh.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202434,692
202530,491
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,819
November 20252,050
October 20252,093
September 20251,829
August 20251,975
July 20252,021
June 20252,620
May 20254,113
April 20255,742
March 20255,305
February 2025-37
January 2025-39
December 20243,419
November 20242,347
October 20241,546
September 20241,462
August 20241,645
July 20241,964
June 20242,388
May 20244,667
April 20241,747
March 20244,359
February 20244,661
January 20244,487

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Clearwater 2 plant?

Clearwater 2 made 0.0% of the 64,124,656 MWh reported by Oregon plants in 2025, from 0.1% of the state's 19,040 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 73rd largest of 302 plants in Oregon, the 4,521st largest of 14,327 in the U.S. and the 395th largest of 1,393 hydro plants. By 2025 generation it is the 91st largest of 278 generating plants in the state.

Clearwater 2 within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)2619,0400.1%
Generation (MWh)30,49164,124,6560.0%
Hydro capacity (MW)268,3600.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Clearwater 2 plant, and when do they retire?

1 operable generator totals 26 MW, with an average age of 72 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s126100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric261953n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Clearwater 2 plant?

EIA lists no joint owners for Clearwater 2. PacifiCorp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PacifiCorp charge homes?

PacifiCorp, the operator of Clearwater 2, had an average residential price of 15.18¢ per kWh and an average bill of $133 a month in 2025, 2% below the Oregon average of 15.46¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Oregon
PacifiCorp15.18¢$1332% lower
Oregon average15.46¢$134
U.S. average17.23¢$15111% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Clearwater 2 plant?

Clearwater 2 is in Idleyld Park, Douglas County, Oregon, at 43.2669° N, 122.4098° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Oregon are similar in size?

Oregon has 63 operable hydro plants with 8,360 MW of capacity, and Clearwater 2's 26 MW is 0% of that.

Hydro plants in Oregon around this size
PlantCountyMW2025 MWh
Lemolo 1Douglas32120,111
Prospect 2Jackson32180,089
Hills CreekLane30115,870
Clearwater 2Douglas2630,491
CougarLane2672,315
PHP 1Multnomah2437,637
FosterLinn2065,226