Wind power plant, Montana
Clearwater Wind III power plant, Montana
Clearwater Wind III is a 100 MW wind power plant in Rosebud County, Montana, operated by Clearwater Wind III, LLC, and it generated 376,741 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Montana, and its capacity factor sits at the 85th percentile of U.S. wind plants. By 2025 generation it ranks 1,667th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Clearwater Wind III plant run compared with other wind plants?
The Clearwater Wind III plant had a capacity factor of 43% in 2025 on 100 MW of net summer capacity, the 85th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 157 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Clearwater Wind III | 43% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Clearwater Wind III plant generating more or less than last year?
Clearwater Wind III generated 376,741 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.5% behind the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 125,121 |
| 2025 | 376,741 |
| 2026 through August | 251,512 |
| 2025, same months | 252,817 |
Monthly generation, Sep 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 21,588 |
| July 2026 | 25,530 |
| June 2026 | 34,011 |
| May 2026 | 34,229 |
| April 2026 | 36,641 |
| March 2026 | 34,004 |
| February 2026 | 28,526 |
| January 2026 | 36,983 |
| December 2025 | 35,857 |
| November 2025 | 31,818 |
| October 2025 | 33,961 |
| September 2025 | 22,288 |
| August 2025 | 24,451 |
| July 2025 | 25,048 |
| June 2025 | 26,391 |
| May 2025 | 35,176 |
| April 2025 | 30,057 |
| March 2025 | 35,111 |
| February 2025 | 32,882 |
| January 2025 | 43,701 |
| December 2024 | 34,655 |
| November 2024 | 31,753 |
| October 2024 | 29,484 |
| September 2024 | 29,229 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Clearwater Wind III plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CW3 | Operating | Onshore Wind Turbine | 100 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Clearwater Wind III plant?
EIA lists no joint owners for Clearwater Wind III. Clearwater Wind III, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Clearwater Wind III plant?
Clearwater Wind III is in Miles City, Rosebud County, Montana, at 46.8188° N, 106.1946° W. It sits in the Avista Corporation balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Montana are similar in size?
Montana has 23 operable wind plants with 2,147 MW of capacity, and Clearwater Wind III's 100 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| NaturEner Glacier Wind Energy 1 | Toole | 107 | 195,704 |
| NaturEner Glacier Wind Energy 2 | Toole | 104 | 216,880 |
| Clearwater Wind II | Rosebud | 103 | 400,709 |
| Clearwater Wind III | Rosebud | 100 | 376,741 |
| South Peak Wind | Judith Basin | 80 | 243,060 |
| Stillwater Wind, LLC | Stillwater | 80 | 252,726 |
Source: EIA Forms EIA-860 and EIA-923, 2025.