Wind power plant, Montana

NaturEner Glacier Wind Energy 1 power plant, Montana

NaturEner Glacier Wind Energy 1 is a 107 MW wind power plant in Toole County, Montana, operated by NaturEner Glacier Wind Energy 1 LLC, and it generated 195,704 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Montana, and its capacity factor sits at the 13th percentile of U.S. wind plants. By 2025 generation it ranks 2,526th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

107 MWNameplate capacity
21%Capacity factor, 2025, 13th percentile, on 104 MW net summer
0.7%Of MT generation, 2025
17 yearsAverage generator age, by MW

How hard does the NaturEner Glacier Wind Energy 1 plant run compared with other wind plants?

The NaturEner Glacier Wind Energy 1 plant had a capacity factor of 21% in 2025 on 104 MW of net summer capacity, the 13th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
NaturEner Glacier Wind Energy 121%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the NaturEner Glacier Wind Energy 1 plant generating more or less than last year?

Generation at NaturEner Glacier Wind Energy 1 fell 13.2% from 2024 to 2025, from 225,577 MWh to 195,704 MWh. Through August 2026 it is running 10.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024225,577
2025195,704
2026 through August147,931
2025, same months133,408
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,654
July 202612,419
June 202614,282
May 202614,250
April 202617,000
March 202620,719
February 202624,755
January 202632,852
December 202517,978
November 202518,658
October 202517,334
September 20258,326
August 20257,507
July 202513,598
June 202512,559
May 202514,236
April 202521,479
March 202522,220
February 202513,675
January 202528,134
December 202424,853
November 202420,515
October 202422,314
September 202415,960
August 202410,731
July 202415,132
June 202416,674
May 202422,050
April 202428,509
March 202412,915
February 202417,334
January 202418,590

Source: EIA Form EIA-923, through August 2026.

How much of Montana's electricity comes from the NaturEner Glacier Wind Energy 1 plant?

NaturEner Glacier Wind Energy 1 made 0.7% of the 26,725,203 MWh reported by Montana plants in 2025, from 1.4% of the state's 7,662 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 18th largest of 73 plants in Montana, the 2,482nd largest of 14,327 in the U.S. and the 603rd largest of 1,358 wind plants. By 2025 generation it is the 30th largest of 71 generating plants in the state.

NaturEner Glacier Wind Energy 1 within Montana, 2025
MeasureThis plantMontanaShare
Capacity (MW)1077,6621.4%
Generation (MWh)195,70426,725,2030.7%
Wind capacity (MW)1072,1475.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the NaturEner Glacier Wind Energy 1 plant, and when do they retire?

1 operable generator totals 107 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1107100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NGW1OperatingOnshore Wind Turbine1072008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the NaturEner Glacier Wind Energy 1 plant?

EIA lists no joint owners for NaturEner Glacier Wind Energy 1. NaturEner Glacier Wind Energy 1 LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the NaturEner Glacier Wind Energy 1 plant?

NaturEner Glacier Wind Energy 1 is in Ethridge, Toole County, Montana, at 48.5100° N, 112.1097° W. It sits in the NaturEner Power Watch, LLC (GWA) balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Montana are similar in size?

Montana has 23 operable wind plants with 2,147 MW of capacity, and NaturEner Glacier Wind Energy 1's 107 MW is 5% of that.

Wind plants in Montana around this size
PlantCountyMW2025 MWh
Clearwater Wind EastCuster208830,411
NaturEner Rim Rock EnergyToole189525,495
Judith Gap Wind Energy CenterWheatland135412,281
NaturEner Glacier Wind Energy 1Toole107195,704
NaturEner Glacier Wind Energy 2Toole104216,880
Clearwater Wind IIRosebud103400,709
Clearwater Wind IIIRosebud100376,741

Source: EIA Forms EIA-860 and EIA-923, 2025.