Wind power plant, Montana
NaturEner Glacier Wind Energy 1 power plant, Montana
NaturEner Glacier Wind Energy 1 is a 107 MW wind power plant in Toole County, Montana, operated by NaturEner Glacier Wind Energy 1 LLC, and it generated 195,704 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Montana, and its capacity factor sits at the 13th percentile of U.S. wind plants. By 2025 generation it ranks 2,526th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the NaturEner Glacier Wind Energy 1 plant run compared with other wind plants?
The NaturEner Glacier Wind Energy 1 plant had a capacity factor of 21% in 2025 on 104 MW of net summer capacity, the 13th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 78 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| NaturEner Glacier Wind Energy 1 | 21% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the NaturEner Glacier Wind Energy 1 plant generating more or less than last year?
Generation at NaturEner Glacier Wind Energy 1 fell 13.2% from 2024 to 2025, from 225,577 MWh to 195,704 MWh. Through August 2026 it is running 10.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 225,577 |
| 2025 | 195,704 |
| 2026 through August | 147,931 |
| 2025, same months | 133,408 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 11,654 |
| July 2026 | 12,419 |
| June 2026 | 14,282 |
| May 2026 | 14,250 |
| April 2026 | 17,000 |
| March 2026 | 20,719 |
| February 2026 | 24,755 |
| January 2026 | 32,852 |
| December 2025 | 17,978 |
| November 2025 | 18,658 |
| October 2025 | 17,334 |
| September 2025 | 8,326 |
| August 2025 | 7,507 |
| July 2025 | 13,598 |
| June 2025 | 12,559 |
| May 2025 | 14,236 |
| April 2025 | 21,479 |
| March 2025 | 22,220 |
| February 2025 | 13,675 |
| January 2025 | 28,134 |
| December 2024 | 24,853 |
| November 2024 | 20,515 |
| October 2024 | 22,314 |
| September 2024 | 15,960 |
| August 2024 | 10,731 |
| July 2024 | 15,132 |
| June 2024 | 16,674 |
| May 2024 | 22,050 |
| April 2024 | 28,509 |
| March 2024 | 12,915 |
| February 2024 | 17,334 |
| January 2024 | 18,590 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the NaturEner Glacier Wind Energy 1 plant, and when do they retire?
1 operable generator totals 107 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 107 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NGW1 | Operating | Onshore Wind Turbine | 107 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the NaturEner Glacier Wind Energy 1 plant?
EIA lists no joint owners for NaturEner Glacier Wind Energy 1. NaturEner Glacier Wind Energy 1 LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the NaturEner Glacier Wind Energy 1 plant?
NaturEner Glacier Wind Energy 1 is in Ethridge, Toole County, Montana, at 48.5100° N, 112.1097° W. It sits in the NaturEner Power Watch, LLC (GWA) balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Montana are similar in size?
Montana has 23 operable wind plants with 2,147 MW of capacity, and NaturEner Glacier Wind Energy 1's 107 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Clearwater Wind East | Custer | 208 | 830,411 |
| NaturEner Rim Rock Energy | Toole | 189 | 525,495 |
| Judith Gap Wind Energy Center | Wheatland | 135 | 412,281 |
| NaturEner Glacier Wind Energy 1 | Toole | 107 | 195,704 |
| NaturEner Glacier Wind Energy 2 | Toole | 104 | 216,880 |
| Clearwater Wind II | Rosebud | 103 | 400,709 |
| Clearwater Wind III | Rosebud | 100 | 376,741 |
Source: EIA Forms EIA-860 and EIA-923, 2025.