Skip to main content
RateWatt

Solar power plant, Virginia

Colonial Trail West solar power plant, Virginia

Colonial Trail West is a 142 MW solar power plant in Surry County, Virginia, operated by Dominion Energy Inc., and it generated 283,404 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Virginia, and its capacity factor sits at the 47th percentile of U.S. solar plants. By 2025 generation it ranks 2,049th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

142 MWNameplate capacity
23%Capacity factor, 2025, 47th percentile, on 142 MW net summer
0.3%Of VA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Colonial Trail West plant run compared with other solar plants?

The Colonial Trail West plant had a capacity factor of 23% in 2025 on 142 MW of net summer capacity, the 47th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Colonial Trail West23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Colonial Trail West plant generating more or less than last year?

Generation at Colonial Trail West rose 0.6% from 2024 to 2025, from 281,781 MWh to 283,404 MWh. Through August 2026 it is running 12.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024281,781
2025283,404
2026 through August227,690
2025, same months203,107
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202634,455
July 202630,425
June 202638,284
May 202633,903
April 202633,762
March 202622,528
February 202617,706
January 202616,627
December 202513,585
November 202519,270
October 202524,797
September 202522,645
August 202530,798
July 202534,948
June 202532,089
May 202523,864
April 202525,492
March 202525,051
February 202516,207
January 202514,658
December 202413,433
November 202415,829
October 202422,701
September 202420,591
August 202430,404
July 202427,308
June 202437,217
May 202427,391
April 202428,015
March 202424,275
February 202420,559
January 202414,058

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Colonial Trail West plant?

Colonial Trail West made 0.3% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.5% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 37th largest of 259 plants in Virginia, the 2,127th largest of 14,327 in the U.S. and the 325th largest of 7,223 solar plants. By 2025 generation it is the 33rd largest of 241 generating plants in the state.

Colonial Trail West within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)14231,3120.5%
Generation (MWh)283,404106,220,8590.3%
Solar capacity (MW)1425,1632.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Colonial Trail West plant, and when do they retire?

1 operable generator totals 142 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1142100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTWSOperatingSolar Photovoltaic1422019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Colonial Trail West plant?

EIA lists no joint owners for Colonial Trail West. Dominion Energy Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Colonial Trail West plant?

Colonial Trail West is in Spring Grove, Surry County, Virginia, at 37.1389° N, 76.9022° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Colonial Trail West's 142 MW is 3% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Carvers Creek SolarGloucester154223,997
Fort Powhatan SolarPrince George150306,961
Spring Grove Solar 2Surry1505,048
Colonial Trail WestSurry142283,404
Chesapeake Solar ProjectChesapeake City132242,848
Bartonsville Energy Facility, LLCFrederick130222,574
Bookers Mill SolarRichmond127170,321

Source: EIA Forms EIA-860 and EIA-923, 2025.