Natural gas power plant, Texas

Colorado Bend II natural gas power plant, Texas

Colorado Bend II is a 1,230 MW natural gas power plant in Wharton County, Texas, operated by Constellation Power, Inc, and it generated 6,072,459 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Texas, and its capacity factor sits at the 78th percentile of U.S. natural gas plants. By 2025 generation it ranks 169th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,230 MWNameplate capacity
61%Capacity factor, 2025, 78th percentile, on 1,143 MW net summer
1.0%Of TX generation, 2025
8 yearsAverage generator age, by MW

How hard does the Colorado Bend II plant run compared with other natural gas plants?

The Colorado Bend II plant had a capacity factor of 61% in 2025 on 1,143 MW of net summer capacity, the 78th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 221 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Colorado Bend II61%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Colorado Bend II plant generating more or less than last year?

Generation at Colorado Bend II fell 13.0% from 2024 to 2025, from 6,978,581 MWh to 6,072,459 MWh. Through August 2026 it is running 15.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20246,978,581
20256,072,459
2026 through August4,591,057
2025, same months3,969,962
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026662,402
July 2026640,277
June 2026631,803
May 2026636,728
April 2026672,346
March 2026273,003
February 2026480,536
January 2026593,962
December 2025513,917
November 2025366,055
October 2025558,961
September 2025663,564
August 2025705,313
July 2025655,931
June 2025426,482
May 2025626,683
April 2025284,010
March 2025124,849
February 2025528,458
January 2025618,236
December 2024366,281
November 2024610,147
October 2024737,900
September 2024584,560
August 2024779,637
July 2024764,176
June 2024614,399
May 2024710,536
April 2024349,330
March 2024190,614
February 2024606,313
January 2024664,688

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Colorado Bend II plant?

Colorado Bend II made 1.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.6% of the state's 195,966 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 18th largest of 1,023 plants in Texas, the 213th largest of 14,327 in the U.S. and the 82nd largest of 1,962 natural gas plants. By 2025 generation it is the 17th largest of 816 generating plants in the state.

Colorado Bend II within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)1,230195,9660.6%
Generation (MWh)6,072,459592,896,1761.0%
Natural gas capacity (MW)1,23081,5741.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Colorado Bend II plant, and when do they retire?

3 operable generators total 1,230 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s31,230100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CT7OperatingNatural Gas Fired Combined Cycle3612017n/a
CT8OperatingNatural Gas Fired Combined Cycle3612017n/a
STG9OperatingNatural Gas Fired Combined Cycle5092017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Colorado Bend II plant?

EIA lists no joint owners for Colorado Bend II. Constellation Power, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Colorado Bend II plant?

Colorado Bend II is in Wharton, Wharton County, Texas, at 29.2894° N, 96.0654° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Colorado Bend II's 1,230 MW is 2% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
HandleyTarrant1,315894,220
Jack CountyWise1,2806,251,601
Wolf Hollow IIHood1,2315,438,193
Colorado Bend IIWharton1,2306,072,459
T H WhartonHarris1,190798,837
Deer Park Energy CenterHarris1,1767,822,166
Odessa-Ector Power PlantEctor1,1538,062,011

Source: EIA Forms EIA-860 and EIA-923, 2025.