Natural gas power plant, Texas

Handley natural gas power plant, Texas

Handley is a 1,315 MW natural gas power plant in Tarrant County, Texas, operated by Constellation Power, Inc, and it generated 894,220 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 32nd percentile of U.S. natural gas plants. By 2025 generation it ranks 799th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,315 MWNameplate capacity
8%Capacity factor, 2025, 32nd percentile, on 1,245 MW net summer
0.2%Of TX generation, 2025
53 yearsAverage generator age, by MW

How hard does the Handley plant run compared with other natural gas plants?

The Handley plant had a capacity factor of 8% in 2025 on 1,245 MW of net summer capacity, the 32nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 30 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Handley8%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Handley plant generating more or less than last year?

Generation at Handley rose 1.5% from 2024 to 2025, from 880,923 MWh to 894,220 MWh. Through August 2026 it is running 3.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024880,923
2025894,220
2026 through August619,028
2025, same months641,469
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026195,234
July 2026128,800
June 202668,730
May 202634,808
April 2026132,636
March 202624,969
February 20262,027
January 202631,824
December 202527,902
November 202547,338
October 202589,587
September 202587,924
August 2025211,528
July 2025105,619
June 202594,358
May 202571,119
April 202570,524
March 202529,976
February 202531,509
January 202526,836
December 202437,776
November 202422,749
October 202469,454
September 202433,412
August 2024281,683
July 202483,700
June 2024141,079
May 202466,793
April 202442,242
March 202460,038
February 202416,693
January 202425,304

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Handley plant?

Handley made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.7% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 15th largest of 1,023 plants in Texas, the 177th largest of 14,327 in the U.S. and the 63rd largest of 1,962 natural gas plants. By 2025 generation it is the 135th largest of 816 generating plants in the state.

Handley within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)1,315195,9660.7%
Generation (MWh)894,220592,896,1760.2%
Natural gas capacity (MW)1,31581,5741.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Handley plant, and when do they retire?

3 operable generators total 1,315 MW, with an average age of 53 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 119 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s140531%none reported
1970s291069%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
3OperatingNatural Gas Steam Turbine4051963n/a
4OperatingNatural Gas Steam Turbine4551976n/a
5OperatingNatural Gas Steam Turbine4551977n/a
1RetiredNatural Gas Steam Turbine4419482009
2RetiredNatural Gas Steam Turbine7519502009

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Handley plant?

EIA lists no joint owners for Handley. Constellation Power, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Handley plant?

Handley is in Fort Worth, Tarrant County, Texas, at 32.7283° N, 97.2192° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Handley's 1,315 MW is 2% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Temple Power StationBell1,6067,647,746
Cedar BayouChambers1,5301,642,498
Cottonwood Energy Company LPNewton1,4344,597,348
HandleyTarrant1,315894,220
Jack CountyWise1,2806,251,601
Wolf Hollow IIHood1,2315,438,193
Colorado Bend IIWharton1,2306,072,459

Source: EIA Forms EIA-860 and EIA-923, 2025.