Skip to main content
RateWatt

Natural gas power plant, Texas

Temple Power Station, Texas

Temple Power Station is a 1,606 MW natural gas power plant in Bell County, Texas, operated by Temple Generation Holdings LLC, and it generated 7,647,746 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in Texas, and its capacity factor sits at the 74th percentile of U.S. natural gas plants. By 2025 generation it ranks 111th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,606 MWNameplate capacity
55%Capacity factor, 2025, 74th percentile, on 1,580 MW net summer
1.3%Of TX generation, 2025
11 yearsAverage generator age, by MW

How hard does Temple Power Station run compared with other natural gas plants?

Temple Power Station had a capacity factor of 55% in 2025 on 1,580 MW of net summer capacity, the 74th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 202 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Temple Power Station55%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Temple Power Station generating more or less than last year?

Generation at Temple Power Station rose 3.9% from 2024 to 2025, from 7,360,248 MWh to 7,647,746 MWh. Through August 2026 it is running 14.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20247,360,248
20257,647,746
2026 through August5,748,412
2025, same months5,021,552
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026801,701
July 2026743,424
June 2026762,653
May 2026732,288
April 2026727,095
March 2026504,174
February 2026693,262
January 2026783,815
December 2025773,012
November 2025625,069
October 2025503,635
September 2025724,478
August 2025800,669
July 2025720,446
June 2025709,302
May 2025759,717
April 2025443,483
March 2025229,183
February 2025574,491
January 2025784,261
December 2024460,875
November 2024166,387
October 2024600,297
September 2024735,952
August 2024843,648
July 2024789,230
June 2024701,257
May 2024623,816
April 2024782,012
March 2024659,835
February 2024289,559
January 2024707,380

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from Temple Power Station?

Temple Power Station made 1.3% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.8% of the state's 195,966 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 11th largest of 1,023 plants in Texas, the 132nd largest of 14,327 in the U.S. and the 38th largest of 1,962 natural gas plants. By 2025 generation it is the 10th largest of 816 generating plants in the state.

Temple Power Station within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)1,606195,9660.8%
Generation (MWh)7,647,746592,896,1761.3%
Natural gas capacity (MW)1,60681,5742.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Temple Power Station, and when do they retire?

6 operable generators total 1,606 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s61,606100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG-1OperatingNatural Gas Fired Combined Cycle2322014n/a
CTG-2OperatingNatural Gas Fired Combined Cycle2322014n/a
STG-1OperatingNatural Gas Fired Combined Cycle3392014n/a
CTG-3OperatingNatural Gas Fired Combined Cycle2322015n/a
CTG-4OperatingNatural Gas Fired Combined Cycle2322015n/a
STG-2OperatingNatural Gas Fired Combined Cycle3392015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Temple Power Station?

2 owners report shares in Temple Power Station; Temple Generation I, LLC holds the largest named share, 50.0% or about 803 MW. Temple Generation Holdings LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Temple Generation I, LLC50.0%8033,823,873
Temple Generation II, LLC50.0%8033,823,873

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is Temple Power Station?

Temple Power Station is in Temple, Bell County, Texas, at 31.0558° N, 97.3172° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Temple Power Station's 1,606 MW is 2% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Forney Energy CenterKaufman1,8949,979,672
SabineOrange1,8123,481,226
Midlothian Energy FacilityEllis1,7346,947,910
Temple Power StationBell1,6067,647,746
Cedar BayouChambers1,5301,642,498
Cottonwood Energy Company LPNewton1,4344,597,348
HandleyTarrant1,315894,220

Source: EIA Forms EIA-860 and EIA-923, 2025.