Columbia Energy Center is a 163 MW natural gas power plant in Boone County, Missouri, operated by City of Columbia-(MO), and it generated 50,997 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Missouri, and its capacity factor sits at the 21st percentile of U.S. natural gas plants. By 2025 generation it ranks 4,071st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

163 MWNameplate capacity
4%Capacity factor, 2025, 21st percentile, on 140 MW net summer
0.1%Of MO generation, 2025
24 yearsAverage generator age, by MW

How hard does the Columbia Energy Center plant run compared with other natural gas plants?

The Columbia Energy Center plant had a capacity factor of 4% in 2025 on 140 MW of net summer capacity, the 21st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 15 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Columbia Energy Center4%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Columbia Energy Center plant generating more or less than last year?

Columbia Energy Center generated 50,997 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
202413,259
202550,997
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,163
November 20251,859
October 20252,336
September 20252,727
August 20255,803
July 202513,993
June 202511,447
May 20250
April 2025571
March 20250
February 20253,539
January 20257,559
December 20241,208
November 202481
October 2024436
September 20240
August 2024665
July 20243,460
June 20241,292
May 2024826
April 20241,185
March 20241,897
February 20241,086
January 20241,122

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Columbia Energy Center plant?

Columbia Energy Center made 0.1% of the 71,443,096 MWh reported by Missouri plants in 2025, from 0.7% of the state's 23,215 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 37th largest of 137 plants in Missouri, the 1,874th largest of 14,327 in the U.S. and the 771st largest of 1,962 natural gas plants. By 2025 generation it is the 50th largest of 122 generating plants in the state.

Columbia Energy Center within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)16323,2150.7%
Generation (MWh)50,99771,443,0960.1%
Natural gas capacity (MW)1636,0852.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Columbia Energy Center plant, and when do they retire?

4 operable generators total 163 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s4163100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CT01OperatingNatural Gas Fired Combustion Turbine412001n/a
CT02OperatingNatural Gas Fired Combustion Turbine412001n/a
CT03OperatingNatural Gas Fired Combustion Turbine412001n/a
CT04OperatingNatural Gas Fired Combustion Turbine412001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Columbia Energy Center plant?

EIA lists no joint owners for Columbia Energy Center. City of Columbia-(MO) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Columbia charge homes?

City of Columbia, the operator of Columbia Energy Center, had an average residential price of 15.50¢ per kWh and an average bill of $124 a month in 2025, 17% above the Missouri average of 13.30¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Missouri
City of Columbia15.50¢$12417% higher
Missouri average13.30¢$138
U.S. average17.23¢$15130% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Columbia Energy Center plant?

Columbia Energy Center is in Columbia, Boone County, Missouri, at 39.0192° N, 92.2629° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Missouri are similar in size?

Missouri has 34 operable natural gas plants with 6,085 MW of capacity, and Columbia Energy Center's 163 MW is 3% of that.

Natural gas plants in Missouri around this size
PlantCountyMW2025 MWh
Peno CreekPike240154,855
Lake Road (MO)Buchanan23640,101
James River Power StationGreene19866,971
Columbia Energy CenterBoone16350,997
EssexStoddard12192,850
McCartneyGreene11880,621
Ralph GreenCass8929,182