Natural gas power plant, Missouri
James River Power Station, Missouri
James River Power Station is a 198 MW natural gas power plant in Greene County, Missouri, operated by City Utilities of Springfield-(MO), and it generated 73,248 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Missouri, and its capacity factor sits at the 24th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,726th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does James River Power Station run compared with other natural gas plants?
James River Power Station had a capacity factor of 5% in 2025 on 155 MW of net summer capacity, the 24th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 18 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| James River Power Station | 5% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is James River Power Station generating more or less than last year?
Generation at James River Power Station fell 49.2% from 2024 to 2025, from 144,133 MWh to 73,248 MWh. Through August 2026 it is running 10.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 144,133 |
| 2025 | 73,248 |
| 2026 through August | 70,745 |
| 2025, same months | 64,123 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 15,023 |
| July 2026 | 18,058 |
| June 2026 | 9,985 |
| May 2026 | 2,347 |
| April 2026 | 2,809 |
| March 2026 | 2,149 |
| February 2026 | 3,860 |
| January 2026 | 16,514 |
| December 2025 | 1,417 |
| November 2025 | 63 |
| October 2025 | 4,488 |
| September 2025 | 3,157 |
| August 2025 | 5,160 |
| July 2025 | 26,079 |
| June 2025 | 15,175 |
| May 2025 | 1,231 |
| April 2025 | 4,780 |
| March 2025 | 1,478 |
| February 2025 | 4,735 |
| January 2025 | 5,485 |
| December 2024 | 2,687 |
| November 2024 | 783 |
| October 2024 | 7,191 |
| September 2024 | 11,670 |
| August 2024 | 21,644 |
| July 2024 | 29,382 |
| June 2024 | 18,705 |
| May 2024 | 14,415 |
| April 2024 | 16,802 |
| March 2024 | 8,063 |
| February 2024 | 2,220 |
| January 2024 | 10,571 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at James River Power Station, and when do they retire?
2 operable generators total 198 MW, with an average age of 34 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 31 MW. 5 have already retired, totalling 253 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 96 | 49% | none reported |
| 1990s | 1 | 102 | 51% | none reported |
Every generator, 8 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GT1 | Operating | Natural Gas Fired Combustion Turbine | 96 | 1989 | n/a |
| GT2 | Operating | Natural Gas Fired Combustion Turbine | 102 | 1992 | n/a |
| BAT1 | Under construction, under half built | Batteries | 31 | 2027 | n/a |
| 1 | Retired | Conventional Steam Coal | 22 | 1957 | 2017 |
| 2 | Retired | Conventional Steam Coal | 22 | 1957 | 2017 |
| 3 | Retired | Conventional Steam Coal | 44 | 1960 | 2017 |
| 4 | Retired | Natural Gas Steam Turbine | 60 | 1964 | 2020 |
| 5 | Retired | Natural Gas Steam Turbine | 105 | 1970 | 2020 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns James River Power Station?
EIA lists no joint owners for James River Power Station. City Utilities of Springfield-(MO) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does City Utilities of Springfield charge homes?
City Utilities of Springfield, the operator of James River Power Station, had an average residential price of 11.65¢ per kWh and an average bill of $101 a month in 2025, 12% below the Missouri average of 13.30¢.
| Measure | Price | Monthly bill | Against Missouri |
|---|---|---|---|
| City Utilities of Springfield | 11.65¢ | $101 | 12% lower |
| Missouri average | 13.30¢ | $138 | |
| U.S. average | 17.23¢ | $151 | 30% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is James River Power Station?
James River Power Station is in Springfield, Greene County, Missouri, at 37.1086° N, 93.2619° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Missouri are similar in size?
Missouri has 34 operable natural gas plants with 6,085 MW of capacity, and James River Power Station's 198 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Greenwood (MO) | Jackson | 285 | 42,389 |
| Peno Creek | Pike | 240 | 154,855 |
| Lake Road (MO) | Buchanan | 236 | 40,101 |
| James River Power Station | Greene | 198 | 66,971 |
| Columbia Energy Center | Boone | 163 | 50,997 |
| Essex | Stoddard | 121 | 92,850 |
| McCartney | Greene | 118 | 80,621 |
Source: EIA Forms EIA-860 and EIA-923, 2025.