Skip to main content
RateWatt

Nuclear power plant, Texas

Comanche Peak nuclear power plant, Texas

Comanche Peak is a 2,430 MW nuclear power plant in Somervell County, Texas, operated by Luminant Generation Company LLC, and it generated 20,058,688 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.4% of the generation reported in Texas, and its capacity factor sits at the 54th percentile of U.S. nuclear plants. By 2025 generation it ranks 9th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

2,430 MWNameplate capacity
95%Capacity factor, 2025, 54th percentile, on 2,400 MW net summer
3.4%Of TX generation, 2025
34 yearsAverage generator age, by MW

How hard does the Comanche Peak plant run compared with other nuclear plants?

The Comanche Peak plant had a capacity factor of 95% in 2025 on 2,400 MW of net summer capacity, the 54th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 348 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Comanche Peak95%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Comanche Peak plant generating more or less than last year?

Generation at Comanche Peak rose 1.9% from 2024 to 2025, from 19,686,655 MWh to 20,058,688 MWh. Through August 2026 it is running 0.5% behind the same months of 2025.

Net generation by period
PeriodMWh
202419,686,655
202520,058,688
2026 through August13,182,300
2025, same months13,242,021
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,732,175
July 20261,762,771
June 20261,717,461
May 20261,009,313
April 20261,729,657
March 20261,801,387
February 20261,627,973
January 20261,801,563
December 20251,800,827
November 20251,737,788
October 20251,772,933
September 20251,505,119
August 20251,757,486
July 20251,765,824
June 20251,716,878
May 20251,351,135
April 20251,421,621
March 20251,796,808
February 20251,628,591
January 20251,803,678
December 20241,800,930
November 20241,168,361
October 20241,440,684
September 20241,707,017
August 20241,754,109
July 20241,755,980
June 20241,727,067
May 20241,589,827
April 20241,734,746
March 20241,538,775
February 20241,665,976
January 20241,803,183

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Comanche Peak plant?

Comanche Peak made 3.4% of the 592,896,176 MWh reported by Texas plants in 2025, from 1.2% of the state's 195,966 MW of capacity. Its share of output is 2.7 times its share of capacity. By capacity it is the 3rd largest of 1,023 plants in Texas, the 39th largest of 14,327 in the U.S. and the 13th largest of 56 nuclear plants. By 2025 generation it is the 2nd largest of 816 generating plants in the state.

Comanche Peak within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)2,430195,9661.2%
Generation (MWh)20,058,688592,896,1763.4%
Nuclear capacity (MW)2,4305,13947.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Comanche Peak plant, and when do they retire?

2 operable generators total 2,430 MW, with an average age of 34 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s22,430100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNuclear1,2151990n/a
2OperatingNuclear1,2151993n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Comanche Peak plant?

Comanche Peak Power Co, LLC is the only joint owner reported for Comanche Peak, with 100.0%. Luminant Generation Company LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Comanche Peak plant?

Comanche Peak is in Glen Rose, Somervell County, Texas, at 32.2984° N, 97.7855° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which nuclear plants in Texas are similar in size?

Texas has 2 operable nuclear plants with 5,139 MW of capacity, and Comanche Peak's 2,430 MW is 47% of that.

Nuclear plants in Texas around this size
PlantCountyMW2025 MWh
South Texas ProjectMatagorda2,70921,782,126
Comanche PeakSomervell2,43020,058,688

Source: EIA Forms EIA-860 and EIA-923, 2025.