South Texas Project is a 2,709 MW nuclear power plant in Matagorda County, Texas, operated by STP Nuclear Operating Co, and it generated 21,782,126 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.7% of the generation reported in Texas, and its capacity factor sits at the 69th percentile of U.S. nuclear plants. By 2025 generation it ranks 6th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

2,709 MWNameplate capacity
96%Capacity factor, 2025, 69th percentile, on 2,580 MW net summer
3.7%Of TX generation, 2025
37 yearsAverage generator age, by MW

How hard does the South Texas Project plant run compared with other nuclear plants?

The South Texas Project plant had a capacity factor of 96% in 2025 on 2,580 MW of net summer capacity, the 69th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 352 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
South Texas Project96%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the South Texas Project plant generating more or less than last year?

Generation at South Texas Project rose 15.1% from 2024 to 2025, from 18,926,463 MWh to 21,782,126 MWh. Through August 2026 it is running 10.0% behind the same months of 2025.

Net generation by period
PeriodMWh
202418,926,463
202521,782,126
2026 through August13,796,589
2025, same months15,324,547
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,918,004
July 20261,923,266
June 20261,532,076
May 20261,955,615
April 20261,124,932
March 20261,552,001
February 20261,798,528
January 20261,992,167
December 20251,991,243
November 20251,535,515
October 20251,055,129
September 20251,875,692
August 20251,926,075
July 20251,936,186
June 20251,882,350
May 20251,946,961
April 20251,882,851
March 20251,972,669
February 20251,785,799
January 20251,991,656
December 20241,983,705
November 20241,511,616
October 20241,073,194
September 20241,856,921
August 20241,855,827
July 20241,651,534
June 20241,802,590
May 20241,292,316
April 2024913,191
March 20241,517,587
February 20241,833,846
January 20241,634,136

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the South Texas Project plant?

South Texas Project made 3.7% of the 592,896,176 MWh reported by Texas plants in 2025, from 1.4% of the state's 195,966 MW of capacity. Its share of output is 2.7 times its share of capacity. By capacity it is the 2nd largest of 1,023 plants in Texas, the 19th largest of 14,327 in the U.S. and the 5th largest of 56 nuclear plants. By 2025 generation it is the largest of 816 generating plants in the state.

South Texas Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)2,709195,9661.4%
Generation (MWh)21,782,126592,896,1763.7%
Nuclear capacity (MW)2,7095,13952.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the South Texas Project plant, and when do they retire?

2 operable generators total 2,709 MW, with an average age of 37 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s22,709100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNuclear1,3541988n/a
2OperatingNuclear1,3541989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the South Texas Project plant?

3 owners report shares in South Texas Project; Constellation Nuclear holds the largest named share, 44.0% or about 1,192 MW. STP Nuclear Operating Co operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Constellation Nuclear44.0%1,1929,584,135
City of San Antonio-(TX)40.0%1,0838,712,850
Austin Energy16.0%4333,485,140

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the South Texas Project plant?

South Texas Project is in Wadsworth, Matagorda County, Texas, at 28.7950° N, 96.0481° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which nuclear plants in Texas are similar in size?

Texas has 2 operable nuclear plants with 5,139 MW of capacity, and South Texas Project's 2,709 MW is 53% of that.

Nuclear plants in Texas around this size
PlantCountyMW2025 MWh
South Texas ProjectMatagorda2,70921,782,126
Comanche PeakSomervell2,43020,058,688

Source: EIA Forms EIA-860 and EIA-923, 2025.