Nuclear power plant, Ohio

Davis Besse nuclear power plant, Ohio

Davis Besse is a 925 MW nuclear power plant in Ottawa County, Ohio, operated by Energy Harbor Nuclear Generation LLC, and it generated 7,791,875 MWh in 2025 (Forms EIA-860 and EIA-923). That is 5.4% of the generation reported in Ohio, and its capacity factor sits at the 89th percentile of U.S. nuclear plants. By 2025 generation it ranks 105th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

925 MWNameplate capacity
99%Capacity factor, 2025, 89th percentile, on 894 MW net summer
5.4%Of OH generation, 2025
48 yearsAverage generator age, by MW

How hard does the Davis Besse plant run compared with other nuclear plants?

The Davis Besse plant had a capacity factor of 99% in 2025 on 894 MW of net summer capacity, the 89th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 363 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Davis Besse99%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Davis Besse plant generating more or less than last year?

Generation at Davis Besse rose 5.8% from 2024 to 2025, from 7,368,124 MWh to 7,791,875 MWh. Through August 2026 it is running 10.9% behind the same months of 2025.

1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20247,368,124
20257,791,875
2026 through August4,575,611
2025, same months5,134,323
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026668,226
July 2026666,709
June 2026647,827
May 2026673,501
April 2026644,851
March 2026-158
February 2026596,970
January 2026677,685
December 2025677,787
November 2025655,994
October 2025674,466
September 2025649,305
August 2025518,967
July 2025667,431
June 2025648,877
May 2025675,447
April 2025654,182
March 2025676,274
February 2025613,535
January 2025679,610
December 2024679,973
November 2024657,241
October 2024675,560
September 2024650,562
August 2024670,168
July 2024669,754
June 2024649,154
May 2024674,439
April 2024651,301
March 202473,343
February 2024636,547
January 2024680,082

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Davis Besse plant?

Davis Besse made 5.4% of the 145,060,499 MWh reported by Ohio plants in 2025, from 2.7% of the state's 34,392 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 12th largest of 215 plants in Ohio, the 340th largest of 14,327 in the U.S. and the 50th largest of 56 nuclear plants. By 2025 generation it is the 6th largest of 187 generating plants in the state.

Davis Besse within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)92534,3922.7%
Generation (MWh)7,791,875145,060,4995.4%
Nuclear capacity (MW)9252,23741.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Davis Besse plant, and when do they retire?

1 operable generator totals 925 MW, with an average age of 48 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s1925100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNuclear9251977n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Davis Besse plant?

EIA lists no joint owners for Davis Besse. Energy Harbor Nuclear Generation LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Davis Besse plant?

Davis Besse is in Oak Harbor, Ottawa County, Ohio, at 41.5967° N, 83.0861° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which nuclear plants in Ohio are similar in size?

Ohio has 2 operable nuclear plants with 2,237 MW of capacity, and Davis Besse's 925 MW is 41% of that.

Nuclear plants in Ohio around this size
PlantCountyMW2025 MWh
PerryLake1,3129,349,983
Davis BesseOttawa9257,791,875

Source: EIA Forms EIA-860 and EIA-923, 2025.