Skip to main content
RateWatt

Solar power plant, Georgia

Dougherty County Solar, LLC power plant, Georgia

Dougherty County Solar, LLC is a 120 MW solar power plant in Dougherty County, Georgia, operated by Dougherty County Solar, LLC, and it generated 268,223 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Georgia, and its capacity factor sits at the 68th percentile of U.S. solar plants. By 2025 generation it ranks 2,123rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

120 MWNameplate capacity
26%Capacity factor, 2025, 68th percentile, on 120 MW net summer
0.2%Of GA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Dougherty County Solar, LLC plant run compared with other solar plants?

The Dougherty County Solar, LLC plant had a capacity factor of 26% in 2025 on 120 MW of net summer capacity, the 68th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Dougherty County Solar, LLC26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Dougherty County Solar, LLC plant generating more or less than last year?

Generation at Dougherty County Solar, LLC rose 1.9% from 2024 to 2025, from 263,106 MWh to 268,223 MWh. Through August 2026 it is running 1.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024263,106
2025268,223
2026 through August194,418
2025, same months191,237
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202625,694
July 202627,189
June 202626,686
May 202625,033
April 202628,945
March 202626,050
February 202618,541
January 202616,280
December 202513,404
November 202518,719
October 202519,325
September 202525,538
August 202522,519
July 202527,584
June 202526,361
May 202525,964
April 202528,535
March 202525,503
February 202516,779
January 202517,992
December 202415,171
November 202414,759
October 202423,030
September 202417,236
August 202429,616
July 202424,857
June 202427,786
May 202425,841
April 202426,918
March 202421,122
February 202419,168
January 202417,602

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Dougherty County Solar, LLC plant?

Dougherty County Solar, LLC made 0.2% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.3% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 54th largest of 263 plants in Georgia, the 2,315th largest of 14,327 in the U.S. and the 378th largest of 7,223 solar plants. By 2025 generation it is the 44th largest of 242 generating plants in the state.

Dougherty County Solar, LLC within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)12042,7190.3%
Generation (MWh)268,223144,967,3520.2%
Solar capacity (MW)1205,4142.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Dougherty County Solar, LLC plant, and when do they retire?

1 operable generator totals 120 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic1202019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Dougherty County Solar, LLC plant?

Quitman Solar, LLC is the only joint owner reported for Dougherty County Solar, LLC, with 100.0%. Dougherty County Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Dougherty County Solar, LLC plant?

Dougherty County Solar, LLC is in Albany, Dougherty County, Georgia, at 31.5120° N, 84.0445° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Dougherty County Solar, LLC's 120 MW is 2% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Taylor County SolarTaylor148257,156
Timberland SolarOglethorpe14041,411
Robins Air Force Base SolarBibb128206,907
Dougherty County Solar, LLCDougherty120268,223
SR Snipesville IIJeff Davis107249,999
SR Snipesville IIIJeff Davis107255,509
SR Clay, LLCClay106219,886

Source: EIA Forms EIA-860 and EIA-923, 2025.