Solar power plant, Georgia

Timberland Solar power plant, Georgia

Timberland Solar is a 140 MW solar power plant in Oglethorpe County, Georgia, operated by RWE Clean Energy, and it generated 41,411 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. solar plants. By 2025 generation it ranks 4,316th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

140 MWNameplate capacity
3%Capacity factor, 2025, 4th percentile, on 140 MW net summer
4,316thU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Timberland Solar plant run compared with other solar plants?

The Timberland Solar plant had a capacity factor of 3% in 2025 on 140 MW of net summer capacity, the 4th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 12 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Timberland Solar3%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Timberland Solar plant generating more or less than last year?

Timberland Solar generated 41,411 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 827.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
202541,411
2026 through August232,875
2025, same months25,116
Monthly generation, Aug 2025 to Aug 2026
MonthMWh
August 202631,402
July 202632,733
June 202635,240
May 202632,298
April 202633,652
March 202629,466
February 202620,894
January 202617,190
December 202516,295
November 20250
October 20250
September 20250
August 202525,116

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Timberland Solar plant?

Timberland Solar made 0.0% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.3% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 50th largest of 263 plants in Georgia, the 2,138th largest of 14,327 in the U.S. and the 329th largest of 7,223 solar plants. By 2025 generation it is the 113th largest of 242 generating plants in the state.

Timberland Solar within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)14042,7190.3%
Generation (MWh)41,411144,967,3520.0%
Solar capacity (MW)1405,4142.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Timberland Solar plant, and when do they retire?

1 operable generator totals 140 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1140100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TSPVOperatingSolar Photovoltaic1402025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Timberland Solar plant?

EIA lists no joint owners for Timberland Solar. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Timberland Solar plant?

Timberland Solar is in Carlton, Oglethorpe County, Georgia, at 33.9643° N, 82.8158° W. It sits in the Southeastern Power Administration balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Timberland Solar's 140 MW is 3% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Quitman II SolarBrooks150314,048
Washington County SolarWashington150312,217
Taylor County SolarTaylor148257,156
Timberland SolarOglethorpe14041,411
Robins Air Force Base SolarBibb128206,907
Dougherty County Solar, LLCDougherty120268,223
SR Snipesville IIJeff Davis107249,999

Source: EIA Forms EIA-860 and EIA-923, 2025.