Solar power plant, Georgia
Timberland Solar power plant, Georgia
Timberland Solar is a 140 MW solar power plant in Oglethorpe County, Georgia, operated by RWE Clean Energy, and it generated 41,411 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. solar plants. By 2025 generation it ranks 4,316th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Timberland Solar plant run compared with other solar plants?
The Timberland Solar plant had a capacity factor of 3% in 2025 on 140 MW of net summer capacity, the 4th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 12 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Timberland Solar | 3% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Timberland Solar plant generating more or less than last year?
Timberland Solar generated 41,411 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 827.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 41,411 |
| 2026 through August | 232,875 |
| 2025, same months | 25,116 |
Monthly generation, Aug 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 31,402 |
| July 2026 | 32,733 |
| June 2026 | 35,240 |
| May 2026 | 32,298 |
| April 2026 | 33,652 |
| March 2026 | 29,466 |
| February 2026 | 20,894 |
| January 2026 | 17,190 |
| December 2025 | 16,295 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 0 |
| August 2025 | 25,116 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Timberland Solar plant, and when do they retire?
1 operable generator totals 140 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 140 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TSPV | Operating | Solar Photovoltaic | 140 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Timberland Solar plant?
EIA lists no joint owners for Timberland Solar. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Timberland Solar plant?
Timberland Solar is in Carlton, Oglethorpe County, Georgia, at 33.9643° N, 82.8158° W. It sits in the Southeastern Power Administration balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Georgia are similar in size?
Georgia has 152 operable solar plants with 5,414 MW of capacity, and Timberland Solar's 140 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Quitman II Solar | Brooks | 150 | 314,048 |
| Washington County Solar | Washington | 150 | 312,217 |
| Taylor County Solar | Taylor | 148 | 257,156 |
| Timberland Solar | Oglethorpe | 140 | 41,411 |
| Robins Air Force Base Solar | Bibb | 128 | 206,907 |
| Dougherty County Solar, LLC | Dougherty | 120 | 268,223 |
| SR Snipesville II | Jeff Davis | 107 | 249,999 |
Source: EIA Forms EIA-860 and EIA-923, 2025.