Solar power plant, Arkansas
Driver Solar power plant, Arkansas
Driver Solar is a 150 MW solar power plant in Mississippi County, Arkansas, operated by Entergy Arkansas LLC, and it generated 419,056 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Arkansas, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 1,534th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Driver Solar plant run compared with other solar plants?
The Driver Solar plant had a capacity factor of 32% in 2025 on 150 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 116 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Driver Solar | 32% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Driver Solar plant generating more or less than last year?
Driver Solar generated 419,056 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.8% ahead of the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 97,495 |
| 2025 | 419,056 |
| 2026 through August | 326,000 |
| 2025, same months | 313,930 |
Monthly generation, Aug 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 57,419 |
| July 2026 | 53,162 |
| June 2026 | 51,653 |
| May 2026 | 39,481 |
| April 2026 | 40,500 |
| March 2026 | 34,255 |
| February 2026 | 26,537 |
| January 2026 | 22,993 |
| December 2025 | 17,514 |
| November 2025 | 24,841 |
| October 2025 | 20,158 |
| September 2025 | 42,613 |
| July 2025 | 63,836 |
| June 2025 | 58,136 |
| May 2025 | 43,398 |
| April 2025 | 47,168 |
| March 2025 | 46,250 |
| February 2025 | 26,425 |
| January 2025 | 28,717 |
| December 2024 | 19,964 |
| November 2024 | 24,566 |
| October 2024 | 43,659 |
| September 2024 | 9,272 |
| August 2024 | 34 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Driver Solar plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| AKDR1 | Operating | Solar Photovoltaic | 150 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Driver Solar plant?
Driver Solar, LLC is the only joint owner reported for Driver Solar, with 100.0%. Entergy Arkansas LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Entergy Arkansas LLC charge homes?
Entergy Arkansas LLC, the operator of Driver Solar, had an average residential price of 13.36¢ per kWh and an average bill of $145 a month in 2025, 4% above the Arkansas average of 12.87¢.
| Measure | Price | Monthly bill | Against Arkansas |
|---|---|---|---|
| Entergy Arkansas LLC | 13.36¢ | $145 | 4% higher |
| Arkansas average | 12.87¢ | $138 | |
| U.S. average | 17.23¢ | $151 | 34% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Driver Solar plant?
Driver Solar is in Osceola, Mississippi County, Arkansas, at 35.6406° N, 89.9694° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arkansas are similar in size?
Arkansas has 65 operable solar plants with 2,534 MW of capacity, and Driver Solar's 150 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Big Cypress Solar, LLC | Crittenden | 180 | 426,346 |
| Newport Solar Project | Jackson | 180 | 356,412 |
| Crooked Lake Solar, LLC | Mississippi | 175 | 393,495 |
| Driver Solar | Mississippi | 150 | 419,056 |
| Quartz Solar, LLC | Cross | 135 | 292,992 |
| Woodruff County Solar | Woodruff | 122 | 203,703 |
| Prairie Mist Solar | Ashley | 109 | 232,039 |
Source: EIA Forms EIA-860 and EIA-923, 2025.