Solar power plant, Connecticut
DWW Solar ll power plant, Connecticut
DWW Solar ll is a 36.9 MW solar power plant in Hartford County, Connecticut, operated by DWW Solar ll LLC, and it generated 45,489 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Connecticut, and its capacity factor sits at the 11th percentile of U.S. solar plants. By 2025 generation it ranks 4,208th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the DWW Solar ll plant run compared with other solar plants?
The DWW Solar ll plant had a capacity factor of 14% in 2025 on 36.9 MW of net summer capacity, the 11th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 51 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| DWW Solar ll | 14% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the DWW Solar ll plant generating more or less than last year?
Generation at DWW Solar ll fell 15.2% from 2024 to 2025, from 53,621 MWh to 45,489 MWh. Through August 2026 it is running 1.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 53,621 |
| 2025 | 45,489 |
| 2026 through August | 36,369 |
| 2025, same months | 35,674 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 5,763 |
| July 2026 | 5,989 |
| June 2026 | 6,336 |
| May 2026 | 5,680 |
| April 2026 | 5,156 |
| March 2026 | 3,989 |
| February 2026 | 2,107 |
| January 2026 | 1,349 |
| December 2025 | 1,797 |
| November 2025 | 1,556 |
| October 2025 | 1,064 |
| September 2025 | 5,398 |
| August 2025 | 6,454 |
| July 2025 | 6,280 |
| June 2025 | 5,286 |
| May 2025 | 4,213 |
| April 2025 | 4,672 |
| March 2025 | 4,451 |
| February 2025 | 1,988 |
| January 2025 | 2,330 |
| December 2024 | 2,377 |
| November 2024 | 3,310 |
| October 2024 | 5,004 |
| September 2024 | 5,154 |
| August 2024 | 5,352 |
| July 2024 | 6,118 |
| June 2024 | 6,155 |
| May 2024 | 5,658 |
| April 2024 | 4,889 |
| March 2024 | 4,656 |
| February 2024 | 3,703 |
| January 2024 | 1,245 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the DWW Solar ll plant, and when do they retire?
1 operable generator totals 36.9 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 37 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| DWWS | Operating | Solar Photovoltaic | 37 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the DWW Solar ll plant?
EIA lists no joint owners for DWW Solar ll. DWW Solar ll LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the DWW Solar ll plant?
DWW Solar ll is in Simsbury, Hartford County, Connecticut, at 41.5416° N, 72.4750° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Connecticut are similar in size?
Connecticut has 90 operable solar plants with 490 MW of capacity, and DWW Solar ll's 36.9 MW is 8% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Quinebaug Solar | Windham | 49 | 78,601 |
| DWW Solar ll | Hartford | 37 | 45,489 |
| Fusion Solar Center LLC | New London | 20 | 38,869 |
| Woods Hill Solar | Windham | 20 | 23,630 |
| SR Litchfield | Litchfield | 20 | 26,366 |
Source: EIA Forms EIA-860 and EIA-923, 2025.