Fusion Solar Center LLC is a 20 MW solar power plant in New London County, Connecticut, operated by Fusion Solar Centre, L.L.C, and it generated 38,869 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Connecticut, and its capacity factor sits at the 42nd percentile of U.S. solar plants. By 2025 generation it ranks 4,399th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
22%Capacity factor, 2025, 42nd percentile, on 20 MW net summer
0.1%Of CT generation, 2025
7 yearsAverage generator age, by MW

How hard does the Fusion Solar Center LLC plant run compared with other solar plants?

The Fusion Solar Center LLC plant had a capacity factor of 22% in 2025 on 20 MW of net summer capacity, the 42nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fusion Solar Center LLC22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fusion Solar Center LLC plant generating more or less than last year?

Generation at Fusion Solar Center LLC fell 1.0% from 2024 to 2025, from 39,272 MWh to 38,869 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.

Net generation by period
PeriodMWh
202439,272
202538,869
2026 through August27,078
2025, same months27,817
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20264,064
July 20264,346
June 20264,503
May 20263,999
April 20263,757
March 20263,152
February 20261,936
January 20261,321
December 20251,625
November 20252,227
October 20253,390
September 20253,810
August 20254,428
July 20254,208
June 20253,957
May 20253,506
April 20253,592
March 20253,502
February 20252,405
January 20252,219
December 20242,117
November 20242,976
October 20243,603
September 20243,539
August 20244,019
July 20243,953
June 20244,439
May 20244,006
April 20243,263
March 20243,409
February 20242,826
January 20241,122

Source: EIA Form EIA-923, through August 2026.

How much of Connecticut's electricity comes from the Fusion Solar Center LLC plant?

Fusion Solar Center LLC made 0.1% of the 43,744,586 MWh reported by Connecticut plants in 2025, from 0.2% of the state's 10,990 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 36th largest of 182 plants in Connecticut, the 4,775th largest of 14,327 in the U.S. and the 1,107th largest of 7,223 solar plants. By 2025 generation it is the 34th largest of 168 generating plants in the state.

Fusion Solar Center LLC within Connecticut, 2025
MeasureThis plantConnecticutShare
Capacity (MW)2010,9900.2%
Generation (MWh)38,86943,744,5860.1%
Solar capacity (MW)204904.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fusion Solar Center LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PVOperatingSolar Photovoltaic202018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fusion Solar Center LLC plant?

EIA lists no joint owners for Fusion Solar Center LLC. Fusion Solar Centre, L.L.C operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fusion Solar Center LLC plant?

Fusion Solar Center LLC is in Baltic, New London County, Connecticut, at 41.6239° N, 72.0431° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Connecticut are similar in size?

Connecticut has 90 operable solar plants with 490 MW of capacity, and Fusion Solar Center LLC's 20 MW is 4% of that.

Solar plants in Connecticut around this size
PlantCountyMW2025 MWh
DWW Solar llHartford3745,489
Fusion Solar Center LLCNew London2038,869
Woods Hill SolarWindham2023,630
SR LitchfieldLitchfield2026,366
Nutmeg SolarHartford2034,517