ENGIE Solidago Solar Project-Hybrid power plant, Delaware

ENGIE Solidago Solar Project-Hybrid is a 50 MW solar power plant in New Castle County, Delaware, operated by ENGIE Solidago Solar LLC, and it generated 97,547 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.8% of the generation reported in Delaware, and its capacity factor sits at the 44th percentile of U.S. solar plants. By 2025 generation it ranks 3,425th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
22%Capacity factor, 2025, 44th percentile, on 50 MW net summer
1.8%Of DE generation, 2025
3 yearsAverage generator age, by MW

How hard does the ENGIE Solidago Solar Project-Hybrid plant run compared with other solar plants?

The ENGIE Solidago Solar Project-Hybrid plant had a capacity factor of 22% in 2025 on 50 MW of net summer capacity, the 44th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
ENGIE Solidago Solar Project-Hybrid22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the ENGIE Solidago Solar Project-Hybrid plant generating more or less than last year?

Generation at ENGIE Solidago Solar Project-Hybrid rose 0.5% from 2024 to 2025, from 97,049 MWh to 97,547 MWh. Through August 2026 it is running 5.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202497,049
202597,547
2026 through August76,631
2025, same months72,765
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,575
July 202612,200
June 202612,725
May 202611,673
April 202610,254
March 20268,028
February 20266,325
January 20264,851
December 20253,504
November 20254,994
October 20257,781
September 20258,503
August 202510,806
July 202512,139
June 202510,058
May 202510,150
April 20259,679
March 20259,470
February 20255,687
January 20254,776
December 20243,877
November 20245,339
October 20248,985
September 20247,815
August 202410,379
July 202411,395
June 202413,265
May 20249,425
April 20249,454
March 20248,740
February 20245,871
January 20242,504

Source: EIA Form EIA-923, through August 2026.

How much of Delaware's electricity comes from the ENGIE Solidago Solar Project-Hybrid plant?

ENGIE Solidago Solar Project-Hybrid made 1.8% of the 5,451,407 MWh reported by Delaware plants in 2025, from 1.7% of the state's 3,020 MW of capacity. By capacity it is the 8th largest of 38 plants in Delaware, the 3,754th largest of 14,327 in the U.S. and the 902nd largest of 7,223 solar plants. By 2025 generation it is the 8th largest of 32 generating plants in the state.

ENGIE Solidago Solar Project-Hybrid within Delaware, 2025
MeasureThis plantDelawareShare
Capacity (MW)503,0201.7%
Generation (MWh)97,5475,451,4071.8%
Solar capacity (MW)5011543.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the ENGIE Solidago Solar Project-Hybrid plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SOLAROperatingSolar Photovoltaic502022n/a
BESSPostponed indefinitelyBatteries13n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the ENGIE Solidago Solar Project-Hybrid plant?

EIA lists no joint owners for ENGIE Solidago Solar Project-Hybrid. ENGIE Solidago Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the ENGIE Solidago Solar Project-Hybrid plant?

ENGIE Solidago Solar Project-Hybrid is in Townsend, New Castle County, Delaware, at 39.3952° N, 75.7535° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.