Other-fuel power plant, Texas
Engineered Carbons Borger Cogen power plant, Texas
Engineered Carbons Borger Cogen is a 20 MW other-fuel power plant in Hutchinson County, Texas, operated by Orion Engineered Carbons, and it generated 31,618 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 14th percentile of U.S. other-fuel plants. By 2025 generation it ranks 4,677th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Engineered Carbons Borger Cogen plant run compared with other other-fuel plants?
The Engineered Carbons Borger Cogen plant had a capacity factor of 19% in 2025 on 18.8 MW of net summer capacity, the 14th percentile of the 37 U.S. other-fuel plants with at least 20 MW. The typical other-fuel plant reached 42%. That equals about 70 days at full output out of 365.
0%Shaded: the middle half of other-fuel plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Engineered Carbons Borger Cogen | 19% |
| Other-fuel plants, 75th percentile | 56% |
| Other-fuel plants, median | 42% |
| Other-fuel plants, 25th percentile | 30% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Engineered Carbons Borger Cogen plant generating more or less than last year?
Generation at Engineered Carbons Borger Cogen fell 60.6% from 2024 to 2025, from 80,243 MWh to 31,618 MWh.
| Period | MWh |
|---|---|
| 2024 | 80,243 |
| 2025 | 31,618 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 6,692 |
| November 2025 | 4,822 |
| October 2025 | 0 |
| September 2025 | 0 |
| August 2025 | 0 |
| July 2025 | 0 |
| June 2025 | 0 |
| May 2025 | 0 |
| April 2025 | 7,053 |
| March 2025 | 4,392 |
| February 2025 | 3,681 |
| January 2025 | 4,978 |
| December 2024 | 6,610 |
| November 2024 | 5,438 |
| October 2024 | 7,031 |
| September 2024 | 7,908 |
| August 2024 | 1,461 |
| July 2024 | 3,904 |
| June 2024 | 6,936 |
| May 2024 | 7,672 |
| April 2024 | 9,076 |
| March 2024 | 9,746 |
| February 2024 | 7,648 |
| January 2024 | 6,813 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Engineered Carbons Borger Cogen plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 43 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Other Gases | 20 | 1982 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Engineered Carbons Borger Cogen plant?
EIA lists no joint owners for Engineered Carbons Borger Cogen. Orion Engineered Carbons operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Engineered Carbons Borger Cogen plant?
Engineered Carbons Borger Cogen is in Borger, Hutchinson County, Texas, at 35.6670° N, 101.4320° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which other-fuel plants in Texas are similar in size?
Texas has 9 operable other-fuel plants with 309 MW of capacity, and Engineered Carbons Borger Cogen's 20 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| BP Chemicals Green Lake Plant | Calhoun | 39 | -52,124 |
| Borger Plant | Hutchinson | 30 | n/a |
| Texas City Plant Union Carbide | Galveston | 26 | 82,810 |
| Engineered Carbons Borger Cogen | Hutchinson | 20 | 31,463 |
| Rentech Nitrogen Pasadena Cogeneration | Harris | 15 | 72,434 |
Source: EIA Forms EIA-860 and EIA-923, 2025.