Other-fuel power plant, Texas
Texas City Plant Union Carbide power plant, Texas
Texas City Plant Union Carbide is a 25.8 MW other-fuel power plant in Galveston County, Texas, operated by Union Carbide Corp-Texas City, and it generated 82,810 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 38th percentile of U.S. other-fuel plants. By 2025 generation it ranks 3,609th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Texas City Plant Union Carbide plant run compared with other other-fuel plants?
The Texas City Plant Union Carbide plant had a capacity factor of 37% in 2025 on 25.8 MW of net summer capacity, the 38th percentile of the 37 U.S. other-fuel plants with at least 20 MW. The typical other-fuel plant reached 42%. That equals about 134 days at full output out of 365.
0%Shaded: the middle half of other-fuel plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Texas City Plant Union Carbide | 37% |
| Other-fuel plants, 75th percentile | 56% |
| Other-fuel plants, median | 42% |
| Other-fuel plants, 25th percentile | 30% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Texas City Plant Union Carbide plant generating more or less than last year?
Texas City Plant Union Carbide generated 82,810 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 102.1% ahead of the same months of 2025. 2024 has output for only 6 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 50,099 |
| 2025 | 82,810 |
| 2026 through August | 80,532 |
| 2025, same months | 39,845 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,739 |
| July 2026 | 12,328 |
| June 2026 | 12,502 |
| May 2026 | 1,531 |
| April 2026 | 3,918 |
| March 2026 | 13,023 |
| February 2026 | 10,626 |
| January 2026 | 12,865 |
| December 2025 | 11,574 |
| November 2025 | 10,467 |
| October 2025 | 9,757 |
| September 2025 | 11,167 |
| August 2025 | 9,317 |
| July 2025 | 6,156 |
| June 2025 | 3,183 |
| May 2025 | 0 |
| April 2025 | 0 |
| March 2025 | 1,746 |
| February 2025 | 9,098 |
| January 2025 | 10,345 |
| December 2024 | 7,565 |
| November 2024 | 9,769 |
| October 2024 | 10,084 |
| September 2024 | 9,983 |
| August 2024 | 10,850 |
| July 2024 | 1,848 |
| June 2024 | 0 |
| May 2024 | 0 |
| April 2024 | 0 |
| March 2024 | 0 |
| February 2024 | 0 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Texas City Plant Union Carbide plant, and when do they retire?
1 operable generator totals 25.8 MW, with an average age of 29 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 40 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 26 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| STG | Operating | All Other | 26 | 1996 | n/a |
| GTG | Retired | Natural Gas Fired Combustion Turbine | 40 | 1996 | 2014 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Texas City Plant Union Carbide plant?
EIA lists no joint owners for Texas City Plant Union Carbide. Union Carbide Corp-Texas City operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Texas City Plant Union Carbide plant?
Texas City Plant Union Carbide is in Texas City, Galveston County, Texas, at 29.3761° N, 94.9465° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which other-fuel plants in Texas are similar in size?
Texas has 9 operable other-fuel plants with 309 MW of capacity, and Texas City Plant Union Carbide's 25.8 MW is 8% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| BP Chemicals Green Lake Plant | Calhoun | 39 | -52,124 |
| Borger Plant | Hutchinson | 30 | n/a |
| Texas City Plant Union Carbide | Galveston | 26 | 82,810 |
| Engineered Carbons Borger Cogen | Hutchinson | 20 | 31,463 |
| Rentech Nitrogen Pasadena Cogeneration | Harris | 15 | 72,434 |
Source: EIA Forms EIA-860 and EIA-923, 2025.