Natural gas power plant, Massachusetts
Exelon West Medway II LLC natural gas power plant, Massachusetts
Exelon West Medway II LLC is a 264 MW natural gas power plant in Norfolk County, Massachusetts, operated by Constellation Power, Inc, and it generated 210,885 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in Massachusetts, and its capacity factor sits at the 39th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,417th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Exelon West Medway II LLC plant run compared with other natural gas plants?
The Exelon West Medway II LLC plant had a capacity factor of 12% in 2025 on 189 MW of net summer capacity, the 39th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 45 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Exelon West Medway II LLC | 12% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Exelon West Medway II LLC plant generating more or less than last year?
Generation at Exelon West Medway II LLC rose 4.8% from 2024 to 2025, from 201,172 MWh to 210,885 MWh. Through August 2026 it is running 15.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 201,172 |
| 2025 | 210,885 |
| 2026 through August | 128,008 |
| 2025, same months | 110,746 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 20,919 |
| July 2026 | 9,604 |
| June 2026 | 11,246 |
| May 2026 | 7,900 |
| April 2026 | 2,369 |
| March 2026 | 18,990 |
| February 2026 | 23,963 |
| January 2026 | 33,017 |
| December 2025 | 27,347 |
| November 2025 | 39,254 |
| October 2025 | 24,205 |
| September 2025 | 9,333 |
| August 2025 | 23,411 |
| July 2025 | 31,367 |
| June 2025 | 17,403 |
| May 2025 | 4,949 |
| April 2025 | 5,204 |
| March 2025 | 10,230 |
| February 2025 | 6,601 |
| January 2025 | 11,581 |
| December 2024 | 10,376 |
| November 2024 | 24,009 |
| October 2024 | 16,918 |
| September 2024 | 16,293 |
| August 2024 | 35,930 |
| July 2024 | 36,750 |
| June 2024 | 29,050 |
| May 2024 | 22,216 |
| April 2024 | 1,095 |
| March 2024 | 2,426 |
| February 2024 | 2,164 |
| January 2024 | 3,945 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Exelon West Medway II LLC plant, and when do they retire?
2 operable generators total 264 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 264 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 4 | Operating | Natural Gas Fired Combustion Turbine | 132 | 2019 | n/a |
| 5 | Operating | Natural Gas Fired Combustion Turbine | 132 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Exelon West Medway II LLC plant?
EIA lists no joint owners for Exelon West Medway II LLC. Constellation Power, Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Exelon West Medway II LLC plant?
Exelon West Medway II LLC is in Medway, Norfolk County, Massachusetts, at 42.1372° N, 71.4447° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Massachusetts are similar in size?
Massachusetts has 40 operable natural gas plants with 5,978 MW of capacity, and Exelon West Medway II LLC's 264 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Millennium Power | Worcester | 428 | 852,182 |
| Bellingham Cogeneration Facility | Norfolk | 386 | 304,572 |
| Berkshire Power | Hampden | 289 | 809,512 |
| Exelon West Medway II LLC | Norfolk | 264 | 205,340 |
| Masspower | Hampden | 261 | 441,701 |
| Milford Power LP | Worcester | 249 | 253,315 |
| Kendall Square Station | Middlesex | 213 | 1,521,096 |
Source: EIA Forms EIA-860 and EIA-923, 2025.