Solar power plant, Indiana
Fairbanks Solar Project, Indiana
Fairbanks Solar Project is a 250 MW solar power plant in Sullivan County, Indiana, operated by Fairbanks Solar Energy Center LLC, and it generated 357,949 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Indiana, and its capacity factor sits at the 14th percentile of U.S. solar plants. By 2025 generation it ranks 1,743rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Fairbanks Solar Project plant run compared with other solar plants?
The Fairbanks Solar Project plant had a capacity factor of 16% in 2025 on 250 MW of net summer capacity, the 14th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 60 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Fairbanks Solar Project | 16% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Fairbanks Solar Project plant generating more or less than last year?
Fairbanks Solar Project generated 357,949 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 73.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 357,949 |
| 2026 through August | 381,709 |
| 2025, same months | 220,555 |
Monthly generation, May 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 54,912 |
| July 2026 | 64,462 |
| June 2026 | 55,044 |
| May 2026 | 57,613 |
| April 2026 | 53,109 |
| March 2026 | 34,453 |
| February 2026 | 33,713 |
| January 2026 | 28,403 |
| December 2025 | 18,940 |
| November 2025 | 24,727 |
| October 2025 | 37,292 |
| September 2025 | 56,435 |
| August 2025 | 64,608 |
| July 2025 | 53,589 |
| June 2025 | 46,796 |
| May 2025 | 55,562 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Fairbanks Solar Project plant, and when do they retire?
1 operable generator totals 250 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 250 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FBNKS | Operating | Solar Photovoltaic | 250 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Fairbanks Solar Project plant?
EIA lists no joint owners for Fairbanks Solar Project. Fairbanks Solar Energy Center LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Fairbanks Solar Project plant?
Fairbanks Solar Project is in Fairbanks, Sullivan County, Indiana, at 39.1933° N, 87.5238° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Indiana are similar in size?
Indiana has 121 operable solar plants with 4,591 MW of capacity, and Fairbanks Solar Project's 250 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Dunns Bridge II Solar | Starke | 435 | 812,439 |
| Mammoth North Solar | Starke | 400 | 748,323 |
| Dunns Bridge I Solar | Jasper | 265 | 508,414 |
| Fairbanks Solar Project | Sullivan | 250 | 357,949 |
| Riverstart Solar Park LLC | Randolph | 200 | 390,012 |
| Indiana Crossroads Solar Park | White | 200 | 378,938 |
| Cavalry Solar Hybrid | White | 200 | 386,028 |
Source: EIA Forms EIA-860 and EIA-923, 2025.