Skip to main content
RateWatt

Solar power plant, North Carolina

Fern Solar LLC power plant, North Carolina

Fern Solar LLC is a 100 MW solar power plant in Edgecombe County, North Carolina, operated by Fern Solar LLC, and it generated 213,214 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in North Carolina, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 2,401st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
24%Capacity factor, 2025, 60th percentile, on 100 MW net summer
0.2%Of NC generation, 2025
5 yearsAverage generator age, by MW

How hard does the Fern Solar LLC plant run compared with other solar plants?

The Fern Solar LLC plant had a capacity factor of 24% in 2025 on 100 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fern Solar LLC24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fern Solar LLC plant generating more or less than last year?

Generation at Fern Solar LLC rose 23.3% from 2024 to 2025, from 172,966 MWh to 213,214 MWh. Through August 2026 it is running 3.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024172,966
2025213,214
2026 through August160,815
2025, same months155,970
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202619,494
July 202622,235
June 202625,530
May 202625,141
April 202624,275
March 202620,381
February 202612,242
January 202611,517
December 202510,156
November 202513,769
October 202516,237
September 202517,082
August 202517,723
July 202525,691
June 202525,522
May 202520,825
April 202521,801
March 202518,814
February 202512,226
January 202513,368
December 20249,807
November 202411,693
October 202418,804
September 202415,338
August 202418,220
July 202415,716
June 202417,975
May 202413,995
April 202414,850
March 202413,000
February 202412,735
January 202410,833

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Fern Solar LLC plant?

Fern Solar LLC made 0.2% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.3% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 39th largest of 928 plants in North Carolina, the 2,602nd largest of 14,327 in the U.S. and the 445th largest of 7,223 solar plants. By 2025 generation it is the 35th largest of 872 generating plants in the state.

Fern Solar LLC within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)10039,9330.3%
Generation (MWh)213,214134,194,4340.2%
Solar capacity (MW)1007,0251.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fern Solar LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FERNOperatingSolar Photovoltaic1002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fern Solar LLC plant?

EIA lists no joint owners for Fern Solar LLC. Fern Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fern Solar LLC plant?

Fern Solar LLC is in Battleboro, Edgecombe County, North Carolina, at 36.0033° N, 77.6964° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Fern Solar LLC's 100 MW is 1% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Albemarle Beach SolarWashington130226,666
Oak SolarNorthampton120255,987
Innovative Solar 37 LLCAnson100137,501
Fern Solar LLCEdgecombe100213,214
Oak Trail Solar, LLCCurrituck100234,748
Aulander Holloman Solar, LLCHertford99168,042
Wilkinson Solar LLCBeaufort81161,211

Source: EIA Forms EIA-860 and EIA-923, 2025.