Solar power plant, North Carolina

Oak Trail Solar, LLC power plant, North Carolina

Oak Trail Solar, LLC is a 100 MW solar power plant in Currituck County, North Carolina, operated by Leeward Asset Management, LLC, and it generated 234,748 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in North Carolina, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 2,298th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
27%Capacity factor, 2025, 77th percentile, on 100 MW net summer
0.2%Of NC generation, 2025
2 yearsAverage generator age, by MW

How hard does the Oak Trail Solar, LLC plant run compared with other solar plants?

The Oak Trail Solar, LLC plant had a capacity factor of 27% in 2025 on 100 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Oak Trail Solar, LLC27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Oak Trail Solar, LLC plant generating more or less than last year?

Generation at Oak Trail Solar, LLC fell 1.1% from 2024 to 2025, from 237,422 MWh to 234,748 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024237,422
2025234,748
2026 through August169,934
2025, same months174,710
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202623,870
July 202623,993
June 202626,561
May 202623,120
April 202625,703
March 202621,220
February 202612,683
January 202612,784
December 202510,702
November 202515,153
October 202516,924
September 202517,259
August 202522,395
July 202526,945
June 202526,784
May 202523,828
April 202525,164
March 202521,196
February 202513,767
January 202514,631
December 202412,594
November 202414,059
October 202419,421
September 202417,648
August 202423,723
July 202425,204
June 202430,523
May 202423,207
April 202422,893
March 202419,612
February 202416,156
January 202412,382

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Oak Trail Solar, LLC plant?

Oak Trail Solar, LLC made 0.2% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.3% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 39th largest of 928 plants in North Carolina, the 2,602nd largest of 14,327 in the U.S. and the 467th largest of 7,223 solar plants. By 2025 generation it is the 32nd largest of 872 generating plants in the state.

Oak Trail Solar, LLC within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)10039,9330.3%
Generation (MWh)234,748134,194,4340.2%
Solar capacity (MW)1007,0251.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Oak Trail Solar, LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic1002023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Oak Trail Solar, LLC plant?

EIA lists no joint owners for Oak Trail Solar, LLC. Leeward Asset Management, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Oak Trail Solar, LLC plant?

Oak Trail Solar, LLC is in Moyock, Currituck County, North Carolina, at 36.5044° N, 76.1887° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Oak Trail Solar, LLC's 100 MW is 1% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Oak SolarNorthampton120255,987
Innovative Solar 37 LLCAnson100137,501
Fern Solar LLCEdgecombe100213,214
Oak Trail Solar, LLCCurrituck100234,748
Aulander Holloman Solar, LLCHertford99168,042
Wilkinson Solar LLCBeaufort81161,211
Conetoe II Solar, LLCEdgecombe80152,971

Source: EIA Forms EIA-860 and EIA-923, 2025.