Solar power plant, North Carolina
Conetoe II Solar, LLC power plant, North Carolina
Conetoe II Solar, LLC is a 80 MW solar power plant in Edgecombe County, North Carolina, operated by Deriva Energy, and it generated 152,971 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 40th percentile of U.S. solar plants. By 2025 generation it ranks 2,870th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Conetoe II Solar, LLC plant run compared with other solar plants?
The Conetoe II Solar, LLC plant had a capacity factor of 22% in 2025 on 80 MW of net summer capacity, the 40th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Conetoe II Solar, LLC | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Conetoe II Solar, LLC plant generating more or less than last year?
Generation at Conetoe II Solar, LLC rose 25.0% from 2024 to 2025, from 122,355 MWh to 152,971 MWh.
| Period | MWh |
|---|---|
| 2024 | 122,355 |
| 2025 | 152,971 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 8,001 |
| November 2025 | 10,808 |
| October 2025 | 11,946 |
| September 2025 | 7,522 |
| August 2025 | 14,652 |
| July 2025 | 16,501 |
| June 2025 | 16,863 |
| May 2025 | 15,499 |
| April 2025 | 17,763 |
| March 2025 | 14,979 |
| February 2025 | 8,748 |
| January 2025 | 9,689 |
| December 2024 | 7,390 |
| November 2024 | 7,590 |
| October 2024 | 10,738 |
| September 2024 | 8,065 |
| August 2024 | 10,862 |
| July 2024 | 11,003 |
| June 2024 | 14,701 |
| May 2024 | 12,234 |
| April 2024 | 12,599 |
| March 2024 | 10,803 |
| February 2024 | 9,033 |
| January 2024 | 7,337 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Conetoe II Solar, LLC plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CONE1 | Operating | Solar Photovoltaic | 80 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Conetoe II Solar, LLC plant?
Conetoe II Solar, LLC is the only joint owner reported for Conetoe II Solar, LLC, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Conetoe II Solar, LLC plant?
Conetoe II Solar, LLC is in Conetoe, Edgecombe County, North Carolina, at 35.8220° N, 77.4810° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in North Carolina are similar in size?
North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Conetoe II Solar, LLC's 80 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Oak Trail Solar, LLC | Currituck | 100 | 234,748 |
| Aulander Holloman Solar, LLC | Hertford | 99 | 168,042 |
| Wilkinson Solar LLC | Beaufort | 81 | 161,211 |
| Conetoe II Solar, LLC | Edgecombe | 80 | 152,971 |
| Harts Mill Solar, LLC | Edgecombe | 80 | 173,322 |
| Red Bud Solar Plant | Nash | 80 | 27,602 |
| Gutenberg Solar | Northampton | 80 | 147,803 |
Source: EIA Forms EIA-860 and EIA-923, 2025.