Skip to main content
RateWatt

Solar power plant, North Carolina

Gutenberg Solar power plant, North Carolina

Gutenberg Solar is a 79.9 MW solar power plant in Northampton County, North Carolina, operated by Dominion Energy Inc., and it generated 147,803 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 33rd percentile of U.S. solar plants. By 2025 generation it ranks 2,922nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

79.9 MWNameplate capacity
21%Capacity factor, 2025, 33rd percentile, on 79.9 MW net summer
0.1%Of NC generation, 2025
6 yearsAverage generator age, by MW

How hard does the Gutenberg Solar plant run compared with other solar plants?

The Gutenberg Solar plant had a capacity factor of 21% in 2025 on 79.9 MW of net summer capacity, the 33rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Gutenberg Solar21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Gutenberg Solar plant generating more or less than last year?

Generation at Gutenberg Solar fell 3.4% from 2024 to 2025, from 152,931 MWh to 147,803 MWh. Through August 2026 it is running 19.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024152,931
2025147,803
2026 through August90,411
2025, same months112,911
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,638
July 202611,543
June 202614,991
May 202614,736
April 202612,455
March 202611,438
February 20266,002
January 20265,608
December 20255,005
November 20257,214
October 202510,820
September 202511,853
August 202513,861
July 202516,603
June 202518,146
May 202514,285
April 202516,870
March 202515,025
February 20258,649
January 20259,472
December 20247,457
November 20249,213
October 202414,532
September 202410,481
August 202415,534
July 202416,189
June 202418,161
May 202413,128
April 202416,159
March 202413,744
February 202410,493
January 20247,840

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Gutenberg Solar plant?

Gutenberg Solar made 0.1% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.2% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 52nd largest of 928 plants in North Carolina, the 3,032nd largest of 14,327 in the U.S. and the 567th largest of 7,223 solar plants. By 2025 generation it is the 50th largest of 872 generating plants in the state.

Gutenberg Solar within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)8039,9330.2%
Generation (MWh)147,803134,194,4340.1%
Solar capacity (MW)807,0251.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Gutenberg Solar plant, and when do they retire?

1 operable generator totals 79.9 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GUTNOperatingSolar Photovoltaic802019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Gutenberg Solar plant?

EIA lists no joint owners for Gutenberg Solar. Dominion Energy Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Gutenberg Solar plant?

Gutenberg Solar is in Garysburg, Northampton County, North Carolina, at 36.4864° N, 77.5348° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Gutenberg Solar's 79.9 MW is 1% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Conetoe II Solar, LLCEdgecombe80152,971
Harts Mill Solar, LLCEdgecombe80173,322
Red Bud Solar PlantNash8027,602
Gutenberg SolarNorthampton80147,803
Phobos Solar, LLCNash79171,842
Trent River Solar, LLCJones79137,074
Innovative Solar 46Cumberland79127,999

Source: EIA Forms EIA-860 and EIA-923, 2025.