Skip to main content
RateWatt

Biomass power plant, Georgia

Flint River Operations biomass power plant, Georgia

Flint River Operations is a 77 MW biomass power plant in Macon County, Georgia, operated by GFC-Flint River Mill, and it generated 440,367 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Georgia, and its capacity factor sits at the 70th percentile of U.S. biomass plants. By 2025 generation it ranks 1,483rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

77 MWNameplate capacity
62%Capacity factor, 2025, 70th percentile, on 77 MW net summer
0.3%Of GA generation, 2025
29 yearsAverage generator age, by MW

How hard does the Flint River Operations plant run compared with other biomass plants?

The Flint River Operations plant had a capacity factor of 62% in 2025 on 77 MW of net summer capacity, the 70th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 226 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Flint River Operations62%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Flint River Operations plant generating more or less than last year?

Generation at Flint River Operations rose 1.5% from 2024 to 2025, from 433,925 MWh to 440,367 MWh.

Net generation by period
PeriodMWh
2024433,925
2025440,367
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202521,816
November 202525,468
October 202525,734
September 202541,248
August 202542,732
July 202541,476
June 202541,395
May 202538,154
April 202542,085
March 202543,267
February 202535,879
January 202541,113
December 202438,332
November 202430,710
October 202424,556
September 202440,414
August 202438,182
July 202440,113
June 202443,257
May 202439,978
April 202425,149
March 202441,881
February 202438,495
January 202432,859

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Flint River Operations plant?

Flint River Operations made 0.3% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 74th largest of 263 plants in Georgia, the 3,081st largest of 14,327 in the U.S. and the 37th largest of 585 biomass plants. By 2025 generation it is the 22nd largest of 242 generating plants in the state.

Flint River Operations within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)7742,7190.2%
Generation (MWh)440,367144,967,3520.3%
Biomass capacity (MW)778828.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Flint River Operations plant, and when do they retire?

2 operable generators total 77 MW, with an average age of 29 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s14255%none reported
2010s13545%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingWood/Wood Waste Biomass421980n/a
GEN2OperatingWood/Wood Waste Biomass352015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Flint River Operations plant?

EIA lists no joint owners for Flint River Operations. GFC-Flint River Mill operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Flint River Operations plant?

Flint River Operations is in Oglethorpe, Macon County, Georgia, at 32.2544° N, 84.0667° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Georgia are similar in size?

Georgia has 23 operable biomass plants with 882 MW of capacity, and Flint River Operations' 77 MW is 9% of that.

Biomass plants in Georgia around this size
PlantCountyMW2025 MWh
Flint River OperationsMacon77416,738
Graphic Packaging Intl Macon MillBibb74325,571
Port Wentworth MillChatham72398,817
Brunswick CelluloseGlynn72157,888

Source: EIA Forms EIA-860 and EIA-923, 2025.